background image

Form No. Z2323

Rev. 06.26.10

4

Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.

Installation and Tapping

ArctiCold Draft Dispenser

Tapping a Single Valve Keg 

(Sankey)

 

  ■ 

Be sure beer faucet is in closed position.

  ■ 

Align keg lugs with lug openings on bottom

 

of coupler.

  ■ 

T

urn clockwise 

1

4

 

turn. Pull handle out and  

 

 

down. Keg is now tapped.

  ■ 

Open shut-off valve on CO

2

 distributor located   

 

inside of the cabinet.

 

IMPORTANT:  Be sure to close this valve  

 

 

when untapping keg.

 

CAUTION:  do not use keg coupler as a 

 

 

handle to lift keg.

Priming the Beer System 

  ■ 

Plug in top refrigeration deck, (15-amp plug),  

 

and allow condensing unit to cycle at least  

 

once, (circulation pump will run continuously),  

 

before tapping the keg.

  ■ 

Couple beer keg to system. Beer temperature 

 

in keg should not exceed 42°F.

  ■ 

Apply 14-17 PSIG carbon dioxide gas

.

  ■ 

Open faucet and pour for approximately 15  

 

 

seconds.

  ■ 

Close faucet and wait for at least 15 minutes to  

 

allow beer system to “pack”.

  ■ 

You are now ready to tap beer.

OUT

DOWN

1/4

TURN

OUT

DOWN

1/4

TURN

OUT

DOWN

1/4

TURN

Single Valve Keg Coupler

Step 1

Step 2

Step 3

Summary of Contents for DC90ACLT

Page 1: ... perlick com Click on Commercial then Service You will see the link to Warranty Registration Form You must complete and submit this form or the installation date will revert back to the ship Date The unit comes with a one year parts warranty This manual has been prepared to assist you in the installation of your ArctiCold Draft Dispenser and to acquaint you with its operation and maintenance We de...

Page 2: ... Epoxy coated aluminum fin and copper tube evaporator coil Digital temperature control Self defrosting glycol mixture 1 3 propylene glycol to 2 3 distilled water Ventilation All sides of unit must be unobstructed to ensure adequate ventilation Plumbing Evaporator condensate and beer waste is pre plumbed to a waste tank located in the CO2 compartment electrical Unit is furnished with 3 prong NEMA 5...

Page 3: ...e compressor and void the warranty Remove the bottom front grille to access the machine compartment Connect the power cord to a separate dedicated circuit as described in the electrical section of this manual Turn on the rocker switch labeled circulating pump and check for glycol leaks Next turn on the rocker switch labeled condensing unit The flash chill heat exchangers and evaporator coil circui...

Page 4: ...de of the cabinet Important Be sure to close this valve when untapping keg CAUTION Do not use keg coupler as a handle to lift keg Priming the Beer System Plug in top refrigeration deck 15 amp plug and allow condensing unit to cycle at least once circulation pump will run continuously before tapping the keg Couple beer keg to system Beer temperature in keg should not exceed 42 F Apply 14 17 PSIG ca...

Page 5: ...e to open position Adjust CO2 gas flow as required turning clock wise for higher pressure Proper CO2 Handling always Connect a regulator reducing valve to CO2 cylinder Secure cylinder in upright position whether in storage or in use Keep cylinder away from heat Rupture disc vents at 122 F maximum Ventilate room after high pressure gas leakage Check the last DOT test date on cylinder neck before fi...

Page 6: ...d maintain the quality of the draft beer Greenish or yellowish colored material on the faucet may indicate bacterial growth Yeast All domestic draft beers contain a small amount of yeast which remains in the beer from the fermentation process When the temperature of draft beer exceeds 50 a process of secondary fermentation may take place The beer faucet may exhibit a white colored substance yeast ...

Page 7: ... a clean glass Place the glass at a 45 angle one inch below faucet Do not let the glass touch the faucet Open the faucet all the way Step 1 Let the remaining beer run straight down the middle of the glass This ensures proper release of CO2 by producing a 3 4 to 1 foam head Step 3 After the glass has reached half full gradually bring the glass to the upright position Step 2 Close the faucet quickly...

Page 8: ...Form No Z2323 Rev 06 26 10 8 Perlick is committed to continuous improvement Therefore we reserve the right to change specifications without prior notice Wiring Diagrams ArctiCold Draft Dispenser ...

Page 9: ...s improvement Therefore we reserve the right to change specifications without prior notice Glycol Loop Diagrams ArctiCold Draft Dispenser FLASH CHILL FIN COIL CIRCUIT GLYCOL TANK TUBE IN TUBE TUBE IN TUBE EVAPORATOR FIN COIL PUMP REFRIG DECK CABINET HEAT EXCHANGER ...

Page 10: ...ycol system should be checked before each operation to ensure an adequate level The glycol reservoir can be accessed by removing the lou vered cover on the refrigeration deck The reservoir is located at the right rear of the deck see figure A Remove the sponge insulation and unscrew the cover While using a mirror ensure the glycol level is at the visible seam inside the reservoir located approxima...

Page 11: ...Form No Z2323 Rev 06 26 10 11 Perlick is committed to continuous improvement Therefore we reserve the right to change specifications without prior notice ...

Page 12: ...ad Milwaukee WI 53223 Phone 414 353 7060 Fax 414 353 7069 Toll Free 800 558 5592 E Mail Perlick Perlick com www Perlick com Perlick is committed to continuous improvement Therefore we reserve the right to change specifications without prior notice 12 ...

Reviews: