70 . DSC 4000 Installation and Hardware Guide
5.
The upper lid is placed on the furnace.
6.
The gripper returns to the home position.
7.
The method runs.
8.
At the end of the run, the system removes the upper lid and places it on the ring.
9.
The system removes the lower lid and places it on the ring.
10.
The sample pan is removed from the furnace and returned to its place in the tray.
11.
The system places the lower lid back into the furnace.
12.
The upper lid is placed back on the lid holder.
13.
The gripper goes to the home position.
14.
The data analysis list for the sample is performed.
15.
If there is another sample in the list, the work cycle, starting with step 1, begins again.
To remove the last sample from the furnace do a “Prepare Sample -Return Sample # #”
as the last Play list step, where # # is the last sample loaded.
A typical work cycle for the autosampler on a TGA 4000 or an STA 6000 and used with a play
list is as follows:
NOTE: Before the start of a play list, the gripper should be over the home position and there
should be no sample pan in the furnace. The furnace lid should be in place on the lid
holder over the furnace.
1.
Start the play list. Your play list may have an explicit
Load Sample
command, or, if
using a Sample Group, the entry Sample List implies Load Sample. Upon reaching this
line in the list, the gripper swings around to remove the furnace lid and place it on the
ring.
2.
The gripper retrieves the specified sample pan and places it in the furnace.
3.
The furnace lid is placed on the lid holder.
4.
The gripper returns to the home position.
5.
The method runs.
6.
At the end of the run, and after the end condition temperature is achieved, the system
removes the furnace lid and places it on the ring.
7.
The sample pan is removed from the furnace and returned to its place in the tray.
8.
The furnace lid is placed back on the lid holder.
9.
The gripper goes to the home position.
10.
The data analysis list for the sample is performed.
11.
If there is another sample in the list, the work cycle, starting with step 1, begins again.
Summary of Contents for DSC 4000
Page 1: ...DSC 4000 Installation and Hardware Guide THERMAL ANALYSIS...
Page 5: ...Introduction...
Page 7: ...Safety and Regulatory Information...
Page 17: ...Safety and Regulatory Information 17...
Page 18: ...Prepare the Laboratory...
Page 21: ...Prepare the Laboratory 21...
Page 22: ......
Page 23: ...Install Multiple Analyzers...
Page 26: ...26 DSC 4000 Installation and Hardware Guide...
Page 27: ...Install a DSC 4000...
Page 52: ......
Page 53: ...DSC 4000 Hardware...
Page 65: ...AS 6000 Autosampler...