Safety/Regulatory Information
1
-24
0993-5255
Safety practices for FIAS and mercury hydride systems
These systems are offered as options for the spectrometer.
Safety checks
Before you start an analysis, make sure that:
–
The laboratory fume ventilation system is operating;
–
The tubing in the fluid system is not constricted since this could lead to a
pressure build-up in the system;
–
The drain tubing is inserted in the waste container and that this container
is empty.
If you are using a flame to heat the QTA-cell or if you intend to perform
flame-FIAS analyses, refer to the information under
Safety Practices for
Flame Atomization
before you ignite the flame.
Summary of Contents for AAnalyst 700
Page 2: ......
Page 3: ...ATOMIC SPECTROMETRY AAnalyst 700 Atomic Absorption Spectrometer User s Guide...
Page 8: ...Contents C 4 0993 5255...
Page 10: ...1 2 0993 5255...
Page 44: ...Safety Regulatory Information 1 36 0993 5255...
Page 46: ...Spectrometer Installation 2 2 0993 5255...
Page 68: ...Spectrometer Installation 2 24 0993 5255...
Page 70: ...Preparing the System 3 2 0993 5255...
Page 84: ...System Maintenance 4 2 0993 5255...
Page 98: ...Parts and Supplies 5 2 0993 5255...
Page 102: ...Laboratory Requirements 6 2 0993 5255...
Page 120: ...Spectrometer System Description 7 2 0993 5255...
Page 136: ...Translations of Warnings 8 2 0993 5255...
Page 146: ...Translations of Warnings 8 12 0993 5255...
Page 185: ...0993 5255 In 1 Index...
Page 186: ...Index In 2 0993 5255...
Page 192: ......
Page 193: ......