Pergola kits USA NEWPORT PERGOLA KIT Assembly Manual Download Page 9

    Shade Slat Installation

Slide shade slats in from end, fasten with ( TYPE X ) self tapping screws.

One Purlin has holes along the top of the

purlin to fasten the shade slats

The center shade slat will need to be
fastened on every purlin, this will keep
the purlins straight and in line with each
other.

Pus

h s

hade

 sla

ts

thr

oug

h c

ut o

uts

in 

pu

rlins

.

8

 |

 

pergolakitsusa

.com

Ste

      

p 9

Deluxe Shade

Regular Shade

Place first shade slat in center on top of purlins,fasten with
( TYPE X ) self tapping screws. Place rest of shade slats every
4" center to center on either side of center shade slat.

Beam

Shade Slats

Fasten every slat on the
outside purlins.

The center shade slat
will need to be fastened
on every purlin, this will
keep the purlins straight
and in line with each other.

 NOTE:

Ensure that post and beam are square
before fastening braces

Predrill 2- 3/8"holes through the outside wall of the
vinyl beam, fasten each ply of the braces to the beams
with two type (U) wood screws
(3/16" X 2 1/2")
fasten through the beam into the brace and plug
the holes with 3/8" plugs.

Fasten the bottom of the brace to the post with
one type (W) 5" screw per brace.

   Beam  Brace Installation

 NOTE:

Braces may not pertain to your pergola kit

If braces are not included in your pergola kit
(SKIP STEP 8)

Summary of Contents for NEWPORT PERGOLA KIT

Page 1: ...Caps Installation Shade Slat Brace Installation Warranty Information Easy step by step instructions Helpful Hints Tools and hardware list Easy to follow drawings Warranty information Pg 1 Pg 3 Pg 2 P...

Page 2: ...4 90 16 BERLIN GARDENS LLC take life outdoorsTM Required for inground applications Hardware Quantity List Suggested People Required For Assembly 2 Tools Required 1 pergolakitsusa com Hardware Wood Lag...

Page 3: ...ps Post Caps Post Caps Bottom 5 8 Plugs 3 8 Plugs 10 x 10 4 6 24 25 8 12 4 4 26 24 10 x 12 4 7 24 25 8 14 4 4 26 28 10 x 14 4 9 24 25 8 18 4 4 26 36 10 x 16 4 10 24 25 8 20 4 4 26 40 12 x 12 4 7 30 31...

Page 4: ...rim Ring Trim Ring Post Insert Post Insert Post Insert Bottom View Of 8 x 8 Post Bottom View Of Round Post Use type U 2 1 2 Wood Screws Bottom View Of 6 x 6 Post Your pergola kit will include a set of...

Page 5: ...t Layout Post Anchor Bracket Pre assembly Center to Center Post Layout Measurments 4 pergolakitsusa com Locate posts on center marks that you created in step 1 With pencil mark locations where concret...

Page 6: ...joists of your deck Fasten the 6 pieces together using 2 1 2 deck screws not included You will need to make four blocks like this Fasten a support block inbetween the floor joists at the location of e...

Page 7: ...asten Top Post Caps with four type U 2 1 2 Wood Screws Apply PVC Glue along the inside edges of the 2X8 Scrolled End Cap firmly push and hold in place on end of beam BE SURE TO SLIDE POST TRIM RINGS O...

Page 8: ...pergolakitsusacom Step 7 Apply PVC Glue along the inside edges of the 2x6 Purlin End Caps firmly push and hold in place on end of purlins Apply 3 8 Vinyl Plugs after purlins are installed Spread out...

Page 9: ...to center on either side of center shade slat Beam Shade Slats Fasten every slat on the outside purlins The center shade slat will need to be fastened on every purlin this will keep the purlins straig...

Page 10: ...9 pergolakitsusa com Congratulations Enjoy your Newport Pergola with friends and family...

Reviews: