Performax GTC2DP Assembly Instructions Manual Download Page 6

6 of 6 

Step 8 

– Final Assembly                                                                                         

 

Adjust levelers so unit is square and doors open / close freely 

 

Wall Attachment   

Insert Screw/Washer (part M & N) thru one of the upper slots in right or left back panel aligning with wall stud. (For 

masonry wall, alternative fasteners are required 

– not included). Mark screw position in wall and drill 1/8” pilot hole.   

Secure fastener into wall stud being sure not to engage screw too deeply to avoid bending the cabinet back. 

 

Some of the materials used in the packaging to protect the parts from damage may leave dust or smudges on the 

steel panels

It is recommended after assembly is complete to use mild soap and water with soft cloth to wipe 

the unit clean. 

 

Questions

?:

Please call toll free (866) 441-5080 

 

 

 

 

                                                                                                                                                                                                          J62310E 

Reviews: