![Performance Designs Optimum OP-106 Manual Download Page 38](http://html.mh-extra.com/html/performance-designs/optimum-op-106/optimum-op-106_manual_1529565038.webp)
MAN-0012 Rev. I
P a g e
| 35
11)
Flake the material between
the C and D lines away from the
line channel in the center of the
pack job. Make sure the D lines
are grouped together and
stacked neatly on top of the A, B,
and C lines. It is important to keep
even tension on all the line
groups throughout the remainder
of the pack job. Pulling on the T
seams directly above the line
attachment points will help keep
the lines straight and maintain the
folds in the material.
13)
Repeat steps 7 through 12 to
flake and the left side of the canopy.
Make sure the line channel in the
center of the pack job is clear, as
indicated by the arrow in the
picture at the left.
12)
Flake the material between the
upper control lines toward the
outside of the pack job, leaving the
control lines stacked neatly on top
of the A, B, C and D lines.