7
Q
uick
S
tart
G
uide
WHa-adP*
Getting Started
20
18
-0
5
6.
Afterwards your project tree should look like this:
Figure 4.
7.
Now the HART Com DTM needs to be configured at first. Double click at the HART
Com DTM (labeled with COM1 or something similar), afterwards the DTM should
open on the right side of the screen:
Figure 5.