Installation and Commissioning
3.1
Preparation
Unpacking the unit
1. Check that all package contents are present and undamaged.
If anything is damaged, inform the shipper and contact the supplier.
2. Check that all items are present and correct based on your order and the shipping
documents.
3.2
If you have any questions, please contact Fuchs.
3. Keep the original packing material in case you need to store or ship the unit at a later time.
Mounting in the field
The device is licensed for operation in confined spaces.
The cooling of the device does not require active components like CPU fan or water cooling
systems. For that reason there are no ventilation slots in the housing.
To avoid overheating during operation, follow the
guidelines
below for field installation:
■
Do not expose the device to direct solar radiation or other heat sources.
■
Since the heat will dissipate via the housing, provide sufficient air circulation.
■
Keep the ambient temperature below the specified maximal value.
3.2.1
Grounding at pedestal and wall arm
Figure 3.1
Ground connection at pedestal/wall arm
Note!
The device is not delivered in sterile condition.
Note!
Fuchs re
commends
us
ing
a cable with a core-cross section of 4 mm
2
for grounding.