Pentair Raychem ECW-GF Installation Instructions Manual Download Page 5

5 / 6

THERMAL BUILDING SOLUTIONS

 EN-RaychemECWGF-IM-H58339      03/15

9 Volt

battery

(not supplied)

Menu

Down

Up

Next

1A

2

1B

Powering Controller via Battery

(This option allows programming the controller prior to powering 
the heating cable and controller circuit.)

• Connect 9 Vdc battery (not provided) to the supplied 

battery connector.

• Plug the battery connector onto the two pins on the 

controller marked “Battery Connector.”

Activating and Navigating the Menu in Set-up Mode

• To activate set-up mode, press 

Menu

 button for 

approximately 3 seconds.

• The display will change to the default mode for units.
• Use the 

Up

 and 

Down

 buttons to change values.  

Use the 

Next

 button to change to next display code/

parameter.

• When completed, secure the enclosure cover.

Powering Controller via Line Power

• Turn on branch circuit breaker that supplies power to the 

controller and heating cable.

  WARNING: Shock Hazard. Secure the wire cover in 

place with the four screws before energizing circuit.

6

• Install wire cover by attaching it to plastic stand-offs.
• Program the controller. (See the section 

“Programming the Controller” that follows.)

• Install lid.
• Leave these instructions with the end user for  

future reference.

Programming the Controller   

To program the controller, supply voltage to the controller in either of the following ways.

Reviews: