![Pentair Raychem ECW-GF Installation Instructions Manual Download Page 3](http://html1.mh-extra.com/html/pentair/raychem-ecw-gf/raychem-ecw-gf_installation-instructions-manual_1524540003.webp)
3 / 6
THERMAL BUILDING SOLUTIONS
EN-RaychemECWGF-IM-H58339 03/15
1 in
(25 mm)
Glass
cloth tape
Pipe strap
JBS-SPA
adapter for
small pipes
Note:
For 1 in (25 mm)
and smaller pipes use
adapter (purchased
separately) and install
between stand and pipe.
Position
adapter
this side
up.
1
Note:
Prepare the heating cable in
the stand following the instructions
included in the FTC-PSK kit.
• Fasten stand to pipe with label
facing desired direction of box
opening. Do not pinch heating
cable.
• Loop and tape extra heating
cable to pipe.
O-ring
2
4
Trim
3
• Screw transition onto
stand until it stops.
Tighten until slots on
transition and stand
align. Do not damage
threads on transition.
• Make sure o-ring is seated in groove
on transition.
• Place box onto transition and install
locknut.
• Tighten locknut.
• Insert cable tie through
slots on stand and
transition and tighten
firmly to prevent
transition rotation.
• Trim off extra cable tie.
Mounting the Raychem ECW-GF controller directly on the pipe using the optional FTC-PSK pipe stand kit