Pentair Raychem ECW-GF Installation Instructions Manual Download Page 3

3 / 6

THERMAL BUILDING SOLUTIONS

 EN-RaychemECWGF-IM-H58339      03/15

1 in

(25 mm)

Glass 

cloth tape

Pipe strap

JBS-SPA

adapter for

small pipes

Note: 

For 1 in (25 mm)

and smaller pipes use

adapter (purchased

separately) and install

between stand and pipe.

Position

adapter

this side

up.

1

Note:

 Prepare the heating cable in 

the stand following the instructions 

included in the FTC-PSK kit.
• Fasten stand to pipe with label 

facing desired direction of box 

opening. Do not pinch heating 

cable.

• Loop and tape extra heating 

cable to pipe.

O-ring

2

4

Trim

3

• Screw transition onto 

stand until it stops. 

Tighten until slots on 

transition and stand 

align. Do not damage 

threads on transition.

• Make sure o-ring is seated in groove 

on transition.

• Place box onto transition and install 

locknut.

• Tighten locknut.

• Insert cable tie through 

slots on stand and 

transition and tighten 

firmly to prevent 

transition rotation.

• Trim off extra cable tie.

Mounting the Raychem ECW-GF controller directly on the pipe using the optional FTC-PSK pipe stand kit

Reviews: