Pentair Raychem ECW-GF Installation Instructions Manual Download Page 2

2 / 6

THERMAL BUILDING SOLUTIONS

 EN-RaychemECWGF-IM-H58339      03/15

Max. screw size:  5/32 in (4 mm)

Hole size: 

 0.25 in (6.4 mm) x 4

Right side entry: 

3/4 NPT (1.09 in)

Bottom entry: 

1 in NPT (1.29 in)

Left side entry:

1/2 in NPT (0.86 in)

1 in to 1/2 in reducing bushing

to RayClic-PC or FTC-P

Earth

Line/ Neutr

al

Line

Line/ Neutr

al

Line

Power

Terminal

Block

To

Heating

Cable

Power

In

Heating cables

using RayClic 

power connection kit

Heating cables

using FTC-P

power connection kit

to RayClic-P

or FTC-P

or MI heating cable

Metal Junction Box

Incoming

Power

Line  Gr

ound

Line / Neutr

al

Earth

Line/ Neutr

al

Line/ Neutr

al

Line

Line

Power

Terminal

Block

To

Heating

Cable

Power

In

1

2A

2B

• Attach box to wall using the 

appropriate mounting fasteners. 

Heating cable directly connected to 
the ECW-GF controller 

• Insert the two heating cable power 

wires from the heating cable’s 

junction box into the terminal block 

marked “To Heating Cable” and 

the ground (braid) marked “Earth” 

and tighten terminals. Confirm 

connection by pulling on the wires.

• For directly connected MI cable, you 

must us a 1 to 1/2 inch reducing 

bushing with grounding hub.

Connecting heating cable using a 
separate junction box

Wall mounting the ECW-GF controller

Reviews: