16
GB
HYDRAULIC INSTALLATION
CHAPTER 3
• MAXIMUM TEMPERATURE OF THE
LIQUID PUMPED: 40 °C
• STATIC LEVEL (initial level of the well)
• DYNAMIC LEVEL (level reached during the group operation)
• FLOW RATE
• MAXIMUM/MINIMUM AMBIENT
TEMPERATURE: 40 °C
Avoid any dry-operating of the motor pump.
The group is not suitable for pumping chemically aggressive or inflammable liquids.
WARNING
WARNING
All the assembly operations must be carried out with group disconnected from the power grid.
DANGER - ELECTRIC SHOCK RISK
LIMITS OF USE
CHAPTER 2
It is a good rule to foresee the evacuation of water losses in case of bad seal of joints, mechanical seal, tanks
overflowing.
WARNING
Our pressurization groups are constructed for the raising clean water without solid suspended particles or abrasive materials.
Fig.2 shows the assembly diagrams normally used.
In the case where the pressurization group is fed by a tank, avoid any unpriming phenomena; we recommend to control the
following characteristic data:
In the case where there would not be any pumping in close proximity from the group, on the discharge line, the installation of a test
faucet is recommended.
It is necessary to control from time to time the pre-replenishment pressure of membrane vessel that must be 0.2 bar lower than
the minimum closing pressure of the pressure switch calibrated lower.
This control must be done without pressure in the installation or with the tanks disassembled.
• To reduce losses during
replenishment it is necessary to
install the group as close as possible
to the pumping point and to install
a suction pipe with a minor number
of curvatures that should have a
sufficiently wide radius
• Even the diameter of the pipe should
be calculated so as to reduce load
losses, what requires dimensions
greater than or equal to those of the
motor pump aspiration inlet
• In order to avoid the formation of
air locks into the suction pipes,
these ones must have a positive
gradient, from bottom to top, avoiding
countergradients or “goosenecks”,
and there must not any infiltration in
the connections
• Connect the delivery collector to the
distribution collector by interposing
vibration-damping joint
• This connection can be done either
on the right side or on the left side of
the collector by displacing the blind
flange or the threaded cover
Summary of Contents for NOCCH
Page 4: ......
Page 103: ...99 1 2 3 4 5 I 6 7 8 9 78 8 2 3 RUS RUS...
Page 104: ...100 79 4 5 RUS RUS...
Page 105: ...101 80 6 NOCCHI PUMPS LINEA M A RUS RUS...
Page 106: ...102 81 OFF ON P1 OFF ON P1 OFF ON P2 RUS RUS...
Page 109: ...105 84 4 5 M A ENTER ENTER 6 ENTER 6a 6b RUS RUS...
Page 111: ...107 86 9 ENTER 9a 10 ENTER 10a1 10a2 RUS RUS...
Page 112: ...108 86 9 ENTER 9a 10 ENTER 10a1 10a2 RUS RUS...
Page 113: ...109 87 11 ENTER MAN M A AUT A1 A2 A3 RUS RUS...
Page 114: ...110 88 9 RUS RUS...
Page 121: ...117 I GB FIGURE PICTURES 95 I...
Page 122: ...118...
Page 127: ......