background image

Pump

Servicing

read  the  following  instructions     

carefully before replacing 

any parts. reasonable care 

and safe methods should be 

practiced. check local codes and 

requirements before installation. 

only 

com pe tent 

electrician 

should make the installations.
Servicing should be performed 

only by knowledgeable pump 

 

service contractor or authorized 

service station.
Remove from power source.

WArning: Shock hazard.

1.  Checking power cord. To be 

sure wires are not burned off or 

broken in cord, use ohmmeter 

to check. Set ohmmeter scale 

pointer to r X 1 scale and 

attach one meter lead to white 

cord wire and one meter lead 

to black cord lead, then place 

screwdriver blade across blade 

terminals of plug. if cord is 

oK, meter needle will go to 

zero and stay there. if meter 

needle does not move, this will 

indicate an open wire and cord 

must be replaced.

2.  Checking motor operation. 

When switch cap is off and 

switch is removed, connect 

two 

terminals 

that 

were          

connected to switch together 

and tape. Plug power cord 

in power receptacle to check 

motor operation. motor should 

start and run smoothly. if 

motor does not start, pump 

must be dismantled and 

 

motor checked.

CAuTiOn: 

Be sure to 

unplug cord before continuing 

or reassembly if pump 

 

is  functional.

3.  Checking motor stator. 

if motor does not run when 

tested as described above, the 

stator must be removed from 

the   housing and checked. 

remove plug (12) from top 

of housing, and pour oil in 

container,    preferably glass, 

so that oil can be observed.

  if oil is clear it will indicate 

motor is not burned and there 

has been no water leaking into 

the motor. if oil is cloudy or 

black, it will indicate water in 

the motor or a burned stator.

  after draining oil, remove 

bolts (10) and remove cord 

nut (25) from motor cord (21). 

remove rubber seal ring from 

around cord. Turn cord and 

lift up until seal ring (26) is 

removed. Pry between ears of 

housing (24) to remove from 

base. disconnect motor cord 

from stator and remove bolts 

(2) and plate. Lift stator from 

base. if stator is visibly burned, 

it must be replaced. if stator is 

not burned but the oil shows 

signs of water, stator can 

be

 

checked with the ohmmeter 

to see if it can be reused.

4.  ground  che    ck. Set ohmmeter 

scale pointer to r X 100K 

scale and check meter by 

putting both meter leads 

together and adjusting the 

 

needle knob until meter reads 

zero. if meter cannot be 

adjusted to zero it will indicate 

that batteries in meter must be 

replaced.

  check meter to zero and adjust 

if necessary before making 

any checks on motor.

  Now connect one meter lead 

to one blade terminal of stator 

and touch other meter lead to 

motor stator shell. if needle 

reads below 5 (500,000 ohms) 

stator must be dried out before 

rechecking. To dry out, place 

motor in 220 degree oven 

for four hours. recheck after 

motor cools. if motor is new 

or thoroughly dry, needle 

of      ohmmeter will not move 

on     the ground check: This  

indicates a reading of 50 

megohms or higher. one 

megohm is one million ohms.

  When making the ground 

check, if the needle goes 

to zero the motor in all 

 

4

Performance Curve

Summary of Contents for Hydromatic SP50

Page 1: ...to the owner of the pumping equip ment or to the responsible party who maintains the system OWNER S MANUAL Submersible Sewage Ejector Pumps 2014 Pentair Ltd All Rights Reserved W 03 232 03 27 14 293 WRIGHT STREET DELAVAN WI 53115 WWW HYDROMATIC COM PH 888 957 8677 ...

Page 2: ...PA 70 2001 Failure to heed above cautions could result in injury or death General Information Pump Warning Note Some city regulations do not allow installing a pump with plastic pipe Check local regulations 5 In applications where the pump may sit idle for months at a time it is recommended that the pump s be cycled every month to ensure the pumping system is working properly when needed 6 Hydroma...

Page 3: ...3 Pump Installation ...

Page 4: ...ur oil in container preferably glass so that oil can be observed If oil is clear it will indicate motor is not burned and there has been no water leaking into the motor If oil is cloudy or black it will indicate water in the motor or a burned stator After draining oil remove bolts 10 and remove cord nut 25 from motor cord 21 Remove rubber seal ring from around cord Turn cord and lift up until seal...

Page 5: ...l after shaft is in place If seal has been chipped it must be replaced Do not replace rotating part of seal until the balance of the pump is assembled 7 Bearings When the pump rotor has been removed check bearings before replacing If bearings are rusted or rough when turned they must be replaced Pull bearings with a bearing puller If puller cannot be replaced over lower bearing remove the outer ra...

Page 6: ...dy for check run before air testing and filling with oil Plug cord 21 into power receptacle and push up on switch chamber diaphragm 23 to start motor Motor should start and run smoothly When pressure is released on diaphragm motor should stop Repeat operation 2 to 3 times to be sure operation is satisfactory and not binding 9 Air test To air test unit put air fitting in plug opening 12 and charge ...

Page 7: ...Cord Nut 1 22 14623 010 1 Power Cord 10 1 22 14623 020 1 Power Cord 20 1 23 139 014 1 Ring Seal 1 1 11584 043 4 Nameplate 1 2 14981 001 1 Plug Pipe 1 4 1 3 56 023 2 Motor Housing Includes Handle 1 4 13594 000 1 Motor 200 V three phase 1 4 13595 000 1 Motor 230 or 460 V three phase 1 4 13596 000 1 Motor 575 V three phase 1 5 77 003 1 O Ring Sq cut 1 6 239 005 1 Bolt 2 7 208 000 2 Flange Discharge 1...

Page 8: ...ute 1 10 203 010 2 Bottom Plate 1 11 614 010 2 Impeller Automatic Manual 1 12 19109A070 Jam Nut 1 13 83 007 1 Seal Shaft 1 14 83 002 1 Seal Assy Stationary 1 15 19099A029 Screw 1 4 20 6 16 51752 404 7 Switch Pressure Ass y Pg 1 17 30 021 1 Screw 1 18 5502 005 1 Bracket Switch 1 19 101 008 1 Screw 4 20 24709110000 Oil Paraffinic 1 21 75 007 1 Cord Nut 1 22 14623 020 1 Power Cord 20 1 23 139 014 1 R...

Page 9: ..._____________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ _______...

Page 10: ..._____________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ _______...

Page 11: ..._____________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ ____________________________________________________ _______...

Page 12: ... be accepted if received after the Warranty Period has expired This warranty is not transferable EXCEPTIONS Hydromatic Special Application Pumps Battery Back Up Sump Pumps Filtered Effluent Pumps Grinder Pumps and 2 1 2 Sewage Pumps are warranted for a period of 12 months from date of purchase or 18 months from date of manufacture whichever comes first HYDROMATIC SHALL NOT BE LIABLE FOR ANY CONSEQ...

Reviews: