Installer manual Fleck 9100 SXT - Installation
38 / 108
Ref. MKT-IM-004 / E - 06.10.2020
5.7
Regeneration flows
Metered
The controller monitors the volume of water used. Once it calculates that there is not enough
capacity for the next operation day, a regeneration cycle will be initiated immediately or at a pre-
set time:
•
immediate control:
the controller measures water usage and regenerates the system as
soon as the system capacity is reached;
•
delayed control:
the controller measures water usage and if the capacity is not reached until
the number of days override, it regenerates the system, at the specified regeneration time.
Summary of Contents for FLECK 9100 SXT
Page 1: ...www pentairaquaeurope com INSTALLER MANUAL FLECK 9100 SXT COMMERCIAL...
Page 73: ...Installer manual Fleck 9100 SXT Maintenance Ref MKT IM 004 E 06 10 2020 73 108...
Page 75: ...Installer manual Fleck 9100 SXT Maintenance Ref MKT IM 004 E 06 10 2020 75 108...
Page 77: ...Installer manual Fleck 9100 SXT Maintenance Ref MKT IM 004 E 06 10 2020 77 108...
Page 80: ...Installer manual Fleck 9100 SXT Maintenance 80 108 Ref MKT IM 004 E 06 10 2020...
Page 82: ...Installer manual Fleck 9100 SXT Maintenance 82 108 Ref MKT IM 004 E 06 10 2020...
Page 84: ...Installer manual Fleck 9100 SXT Maintenance 84 108 Ref MKT IM 004 E 06 10 2020...
Page 87: ...Installer manual Fleck 9100 SXT Maintenance Ref MKT IM 004 E 06 10 2020 87 108...