Installer manual Fleck 4600 MECH - Programming
Ref. MKT-IM-027 / C - 12.11.2019
49 / 92
6.3.1
Calculating the number of days between two regenerations
Set the number of days between two regenerations using the following formulas:
Water capacity [m
3
] = (Exchange capacity [m
3
°tH] - Reserve capacity [m
3
]) / Water hardness [°tH]
Number of days between regenerations = Water capacity [m
3
] / Daily water consumption [m
3
]
6.3.2
Set the number of days between two regenerations
1. Push the pins (
1
) out to set up.
Info
Example for the following drawing, the regeneration will occurs on Monday and
Thursday.
There are two time clock wheels:
7 days: based on the week, number 1 will refer to Monday, number 7 to Sunday;
12 days: allows to set a regular interval every 2, 3, 4 or 6 days.