background image

 

PIPE ASSEMBLY

Incorrect

Correct

Accumulated

air

 

 

 

Warning 

 

The pump should never be started if the 
check valve on the delivery side is closed, 
because this would increase the 
temperature of the fluid inside the pump. 
The accumulation of steam could cause 
cavitation, which could damage the moving 
components. 
If the valve can operate with a closed valve, 
it is advisable to ensure a minimum fluid 
flow by means of a by-pass or a drain. The 
drain can also be connected to a collection 
reservoir every time it is necessary to 
provide a minimum flow equivalent to at 
least 10% of the rated one in the maximum 
yield point. Flow rate and head in the 
maximum yield point are printed on the 
pump nameplate. 

 
 

3.6.3 Air vent 

 
Considering that the mechanical seal is water lubricated, the 
machine should be operated only after the machine and the 
system have been filled with water and vented from air. The air 
is vented from the pump through a special vent valve. 
 

VENT VALVE

 

 
 

This operation doesn’t need to be performed on machines 
installed on vertical pipes with flow directed upwards. 
For twin machines with horizontal or vertical shaft, this 
operation should be performed by loosening the 1/8” cap on 
the pump housing. 
Sometimes the air venting operation needs to be repeated 
several times to completely remove the noise originating from 
the presence of air in the pump. 
 
 
 
 

 
3.6.4 Terminal block positioning 

 

Warning 

 

Before performing any operation, make 
sure that the pump is not connected to the 
power supply and that it cannot be started 
accidentally. 

 
The terminal block can be rotated in any position by 90° steps. 
 

 

 
To change the position of the terminal block, perform the 
operations described here below: 

1. If necessary, use a screwdriver to remove the grid that 

protects the motor-pump coupling. Do not remove the 
coupling. 

2.  Remove the screws that fix the motor to the pump body. 

3.  Turn the motor in the desired position. 

4.  Reposition and tighten the screws. 

5.  Reassemble the protection grid. 
 
 

3.6.5 Connection to the mains 

 

Danger 

 

The installer will have to make sure that the 
electric supply system has an adequate 
grounding compliant with the laws in force. 

 

Danger 

 

Check that the supply system has a 
differential switch with a degree of 
sensitivity of 

 = 30 mA (DIN VDE 

0100T739). 

 
 

Danger 

 

Before removing the cover from the 
terminal block of the motor and before 
performing operations on the machine, 
make sure that the supply line has been 
cut-off. 

 
 

NOTE

 

The electric motors of twin machines are 
connected separately. 

 

Summary of Contents for Nocchi R2T

Page 1: ...GB Use and maintenance manual F Manuel d utilisation et d entretien D Bedienungs und Wartungsanleitung E Manual de uso y manutenci n NL Handleiding voor gebruik en onderhound RUS Bycnherwbb gj ecnfyj...

Page 2: ...iability 3 INSTALLATION Page 17 3 1 Lifting 3 1 1 Machine without any type of packing 3 1 2 Machine packed in a cardboard box 3 2 Transportation 3 3 Storage 3 3 1 Characteristics of the storage area 3...

Page 3: ...ification data 1 3 Machine identification data Machine code R 2 T D 65 60 X 6 Circulating pump 2 two pole motor 4 four pole motor Coupling to standard motor Twin type Rated diameter of mouths Max head...

Page 4: ...he property 1 6 Conventions 1 6 1 Terminological conventions The following conventions have been adopted throughout the manual Machine electropumps specified in section Product specifications Authoris...

Page 5: ...Fax 050 70 31 37 1 11 How to use the documentation supplied Operators should carefully read the documentation supplied before performing any operation on the machine The documentation supplied should...

Page 6: ...ace with a capacity above the weight of the machines stored Protection against accidental impacts 3 3 2 Environmental characteristics of the storage area The storage area should have the following env...

Page 7: ...n a low position to avoid water entering the motor and the bearings See the following figure for reference R4T R2T R4TD R2TD Install the machine on horizontal or vertical pipes on the delivery and ret...

Page 8: ...be performed by loosening the 1 8 cap on the pump housing Sometimes the air venting operation needs to be repeated several times to completely remove the noise originating from the presence of air in...

Page 9: ...operation of the machine for an hour If the number of starts stops is above 40 adjust the control equipment in order to reduce the frequency Danger For high temperature fluids it is necessary to allow...

Page 10: ...using the cut off switch Close the gates on the suction and delivery lines Loosen the screws that fix the terminal block cover Disconnect the wires from the terminal block Remove the supply cable from...

Page 11: ...The line voltage has been interrupted 2 Burnt fuse 3 No conduction in the starter contacts or faulty coil 4 Burnt fuses in the auxiliary circuit E The machine flow rate is irregular 1 Air present in...

Page 12: ...Dimensioni e pesi Dimensions and weights Dimensions and poids Abmessungen und Gewichte pag 75 Dimensiones y pesos Afmetingen en gewichten Prestazioni Performances Performances Leistungen pag 76 Presta...

Page 13: ...5 4 0 4 2 RL4TD 40 30 2 x 0 25 2 x 0 37 1380 2840 2810 2 x 0 55 2 x 0 25 2 x 0 37 2 x 0 75 3 x 230 400 2 x 1 10 2 x 0 25 2 x 0 37 50 1380 1390 2810 2860 1380 1390 2 x 1 10 2 x 1 50 2 x 0 25 2 x 0 75 2...

Page 14: ...120 RL2TD 50 180 RL4TD 65 30 RL4TD 65 60 RL2TD 65 120 RL2TD 65 180 RL4TD 80 30 RL4TD 80 60 RL2TD 80 120 RL2TD 80 180 RL4TD 100 30 RL4TD 100 60 RL2TD 100 120 80 130 100 14 4 68 343 411 250 281 101 180...

Page 15: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 40 76...

Page 16: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 50 77...

Page 17: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 65 78...

Page 18: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 80 79...

Page 19: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2T R4T 100 80...

Page 20: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 40 81...

Page 21: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 50 82...

Page 22: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 65 83...

Page 23: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 80 84...

Page 24: ...Prestazioni Performances Performances Leitungen Prestaciones Prestaties R2TD R4TD 100 85...

Reviews: