INSTALLATION

INSTALLATION (TYPICAL): SEPARATE DISCHARGE

Unplug the primary sump pump before beginning this 
procedure.

 

Risk of electrical shock. 

Can shock, burn, or kill. 

1.  Allow for overlap when cutting piping and run a trial (dry) 

fitting before you glue.

2.  Use PTFE pipe thread sealant tape on male ends of 

discharge pipe. Thread the 1-1/4” x 1-1/2” elbow (supplied) 
onto the discharge. When tight, the elbow must point up. 

3.  If possible, install the Battery Backup Unit (BBU) on 

the floor of the sump. Be sure that the two pumps do 
not touch each other and do not interfere with switch 
operation. 

NOTE

:

 If debris or gravel is present in the bottom of the 

sump pit that could get sucked up into the pump, set 
both the primary sump pump and the BBU up on bricks or 
cinder blocks to prevent clogging.

4.  If the sump is too small to allow both pumps to sit on 

the bottom of the sump, install an angle bracket on the 
primary sump pump’s discharge pipe with stainless steel 
hose clamps. 
Mount the backup pump on the angle bracket (Figure 2). 

5.  Cut a piece of 1-1/2” PVC pipe to reach from the backup 

pump discharge elbow to about one (1) foot above the 
basement floor. This is the lower discharge pipe. 

6.  To prevent airlocking the pump during operation, drill a 

1/8” hole in the lower discharge pipe about 2” above the 
bottom of the pipe (below floor level). 

7.  Install FP0026-10 check valve (purchase separately) on 

the upper end of the pipe. 
Tighten the hose clamps securely. 

BE SURE

 that the flow 

arrows point UP (away from the BBU). If they point down, 
the valve will not pass water and the pump will not work.

8.  Cut a short length of 1-1/2” PVC pipe for a riser pipe and 

clamp it into the top of the check valve.

9.  Install a U74-68 Hose and Clamp Assembly (sold 

separately) on the top of the riser pipe. For 1-1/2” pipe, 
remove and discard the short piece of 1-1/4” hose in the 
Hose and Clamp Assembly. Leave the hose clamps loose 
and slide the Assembly down below the top of the riser 
pipe. 

10.  Determine where you want the discharge to exit the 

basement. At that point, drill the necessary holes (large  
enough to have clearance for a 1-1/2” pipe) to allow you 
to run the discharge pipe from above the sump to the 
outdoors.

11.  Install the horizontal discharge pipe. Install a 90° elbow on 

the inside end but do not glue. 

12.  Cut another short piece of 1-1/2” PVC for the Upper 

Discharge Pipe to run from the top of the riser pipe up to 
the 90° elbow. Be sure to allow enough overlap for the glue 
joint in the elbow.

13.  Do a trial fit with NO GLUE, installing the 1-1/2” upper 

discharge pipe in the 90° elbow and the upper discharge 
pipe in the vertical end of the 90° elbow. 
The upper discharge pipe should just fit between the riser 
pipe and the elbow. 

14.  Whenever using PVC primer and PVC cement, follow the 

glue manufacturer’s instructions. 

Risk of 

fire and chemical inhalation.

15.  Make sure that the BBU clears the primary sump pump 

and its switch. If there isn’t room for both pumps to sit 
on the floor of the sump, the BBU will have to be raised 
(depending on your particular situation).

16.  Clean, prime and glue the upper discharge pipe into the 

90º elbow. When the glue has set, slide the Hose and 
Clamp Assembly up to cover the joint and tighten all the 
hose clamps.

17.  Install the Battery Backup Switch as shown, 1” above start 

water level of primary pump. Fasten it to the pipe with 
cable ties. 

18.  Tape the pump cord to the riser pipe so that the plug 

cannot fall into the sump.

19.  Go to BBU WIRING AND SETUP section of this manual for 

wiring instructions. 

20.  Once all wiring is complete, fill your pit with water and 

verify that the primary sump pump removes the water and 
the BBU doesn’t run. 

21.  Then, unplug your primary sump pump and refill your pit 

with water. Verify that the BBU pump removes the water.

22.  Make sure that the power is on to both pumps, and your 

system is ready to use.

Summary of Contents for FG-3100RF

Page 1: ...ter ie Est ado de labat er a Ala rm Sile nce d Ala rm earr t e Ala rm aapa gad a Tes tSys tem Tes ter Pro bar sis tem a Sile nce Ala rm Arr te rl alarm e Apa gar ala rm a Lig ht Lum i re Luz Cir cui...

Page 2: ...ONTENTS SECTION PAGE Safety Information 3 General Information 4 Internet And Alerts Setup 5 Installation 6 Battery Requirements 10 Wiring And Setup 11 Charger Controller Display 13 Troubleshooting 15...

Page 3: ...ging in or unplugging charger If basement floor is wet disconnect power to basement before walking on floor Risk of flooding Do not run pump dry To do so will damage seals and can cause leaking and pr...

Page 4: ...eaner Cloth towel Plastic fittings Check valve s 1 or 2 depending on installation 38 120 Ampere Hour Storage or Deep Cycle Battery REQUIRED BATTERY CAPACITY For best results use the following AGM Stor...

Page 5: ...to Gateway Trouble in the manual 16 Connect the red positive charger controller lead wire to the positive red battery terminal 17 Connect the black negative charger controller lead wire to the negativ...

Page 6: ...rt piece of 1 1 4 hose in the Hose and Clamp Assembly Leave the hose clamps loose and slide the Assembly down below the top of the riser pipe 10 Determine where you want the discharge to exit the base...

Page 7: ...p System Items in italics must be purchased separately FLOW Slope DOWN to outlet Sill FP0026 10 Check Valve Purchase Separately PTFE pipe thread sealant tape on all threaded joints 1 1 2 PVC Riser Pip...

Page 8: ...sitting as installed 10 If the primary sump pump does not have a check valve installed in the discharge pipe install one now 11 Cut a length of discharge pipe for the primary sump pump to fit between...

Page 9: ...from the pump being protected The water level when the switch shuts off must be above the BBU pump intake Supplied with the Battery Backup System Items in italics must be purchased separately Typical...

Page 10: ...ST 1 AND 2 Charger is charging at a very low level to try to bring a dead battery back to life If the battery is taking too long try resetting the charger once or twice push the System Test and Silenc...

Page 11: ...ot polarity sensitive Connect the float switch leads to the Float Switch tabs on the charger controller 6 Test the float and the pump by lifting and holding the float The system alert LED will blink w...

Page 12: ...nd 20 3 Fast Beep Fast LED Flash the battery is severely discharged The battery will continue to charge as long as the 115V AC power to the charger is on at the rate of 5 AH until the battery s charge...

Page 13: ...tem operation no action is required However if the BBU pump is running or has run check the primary pump and actively monitor the charger status for battery life Always reset the charger after the pum...

Page 14: ...resets and error code resets Silence Alarm Toggle Prevents the audible alarm sounding Press and release to reset Light Toggles the light on the Charger Controller on and off System Reset Press and rel...

Page 15: ...valve is installed and functioning between the primary pump discharge and the Battery Backup wye Check for an obstruction in the discharge pipe The discharge pipe length and or height exceeds the capa...

Page 16: ...8 7 Cable Ties 11 8 Gateway Kit Gateway Power Supply 1m RJ45 Cable U117 1568 9 Switch Bracket PS17 2004 If pump fails replace entire system Sold separately NOTICE All check valves must be installed as...

Page 17: ...ty Note also that three phase motors must be protected by three leg ambient compensated extra quick trip overload relays of the recommended size or the warranty is void Your only remedy and HYDROMATIC...

Page 18: ...ySta tus ta tde bat ter ie Est ado de labat er a Ala rm Sile nce d Ala rm earr t e Ala rm aapa gad a Tes tSys tem Tes ter Pro bar sis tem a Sile nce Ala rm Arr te rl alarm e Apa gar ala rm a Lig ht L...

Page 19: ...relatifs la s curit 20 Renseignements g n raux 21 Configuration de la connexion Internet et des alertes 22 Installation 23 Exigences relatives la batterie 27 C blage et installation 28 Affichage du ch...

Page 20: ...du sous sol avant de marcher sur le plancher Risque d inondation Ne faites pas fonctionner la pompe sec Cela endommage les joints et pourrait provoquer des fuites et des dommages mat riels Conformez v...

Page 21: ...ux selon l installation Batterie rechargeable ou d charge pouss e de 38 120 amp res heures CAPACIT DE BATTERIE N CESSAIRE Pour obtenir de meilleurs r sultats utilisez les batteries AGM suivantes Pi ce...

Page 22: ...au D pannage de la passerelle de ce manuel 16 Branchez le fil conducteur rouge positif du chargeur contr leur la borne positive rouge de la batterie 17 Branchez le fil conducteur noir n gatif du charg...

Page 23: ...ser l assemblage vers le bas sous la partie sup rieure du tuyau ascendant 10 D terminez quel endroit vous voulez que la d charge soit vacu e du sous sol cet endroit percez les trous n cessaires assez...

Page 24: ...Coude coulissant femelle 1 1 4 po FNPT x 1 1 2 po Syst me de secours batterie Tuyau d vacuation inf rieur de 1 1 2 po en PVC coup la bonne dimension Clapet de non retour de la pompe principale Fl che...

Page 25: ...de la pompe de puisard principale n est pas pourvu d un clapet de non retour installez en un maintenant 11 Coupez une longueur de tuyau d vacuation destin e tre install e entre le clapet de non retour...

Page 26: ...tre install s du c t pompe du raccord en Y Clapet de non retour FP0026 10 vendu s par ment Tuyau ascendant de 1 1 2 po en PVC coup la bonne dimension Tuyau d vacuation sup rieur de 1 1 2 po en PVC co...

Page 27: ...itez le contact avec la peau les yeux et les v tements TEST DE PR QUALIFICATION 1 ET 2 Le chargeur effectue une recharge tr s lentement pour tenter de redonner vie une batterie plat Si la batterie met...

Page 28: ...l interrupteur flotteur aux languettes qui correspondent l interrupteur flotteur sur le chargeur contr leur 6 Testez le flotteur et la pompe en soulevant et en tenant le flotteur Le voyant SYSTEM ALE...

Page 29: ...charge de la batterie se situe entre 0 et 20 3 Bip rapide voyant DEL clignotant rapidement la batterie est tr s d charg e La batterie continuera de se recharger tant et aussi longtemps que l alimentat...

Page 30: ...nt que l interrupteur flotteur est en position de marche ce qui indique que la pompe devrait se mettre en marche d ici trois secondes Le voyant AC POWER courant alternatif reste allum continuellement...

Page 31: ...contr leur Le chargeur effectuait la recharge tr s lentement pour tenter de redonner vie une batterie plat mais la batterie mettait trop de temps se recharger Essayez de r initialiser le chargeur une...

Page 32: ...lapet de non retour est install et qu il fonctionne entre la d charge de la pompe principale et le raccord en Y de la pompe de secours batterie V rifiez si le tuyau d vacuation est bouch La longueur o...

Page 33: ...relle bloc d alimentation c ble RJ45 de 1 m U117 1568 9 Support d interrupteur PS17 2004 Si la pompe fait d faillance remplacez le syst me au complet Vendues s par ment REMARQUE Tous les clapets de no...

Page 34: ...ent tre prot g s par des relais de surcharge trois branches compensation ambiante et d clenchement extrarapide du calibre recommand sans quoi la garantie est annul e Votre seul recours et la seule res...

Page 35: ...t ter ySta tus ta tde bat ter ie Est ado de labat er a Ala rm Sile nce d Ala rm earr t e Ala rm aapa gad a Tes tSys tem Tes ter Pro bar sis tem a Sile nce Ala rm Arr te rl alarm e Apa gar ala rm a Lig...

Page 36: ...i n de retencion 37 Informaci n general 38 Configuraci n de alertas e Internet 39 Instalaci n 40 Requisitos de la bater a 44 Configuraci n y cableado 45 Pantalla del cargador controlador 47 Resoluci n...

Page 37: ...e el cargador Si el piso del s tano est h medo desconecte la energ a del s tano antes de pisar el suelo Riesgo de inundaci n No ponga en funcionamiento la bomba en seco Si lo hace se da ar n las junta...

Page 38: ...onexiones de pl stico V lvulas de retencion 1 o 2 seg n la instalaci n Bater a de almacenamiento o de ciclo profundo de 38 120 amperios hora CAPACIDAD QUE SE REQUIERE PARA LA BATER A Para obtener los...

Page 39: ...del cargador controlador en el terminal positivo rojo de la bater a 17 Conecte el cable conductor negro negativo del cargador controlador en el terminal negativo negro de la bater a 18 Conecte el cabl...

Page 40: ...o de manguera de 1 1 4 en el ensamblaje de manguera y abrazadera Deje sueltas las abrazaderas para manguera y deslice el ensamblaje por debajo de la parte superior del tubo ascendente 10 Decida el lu...

Page 41: ...1 1 2 de deslizamiento Bomba de sumidero operada por bateria Tubo de descarga inferior de PVC de 1 1 2 cortado para la conexi n V lvuladeretenciondela bombadesumideroprincipal Flecha de flujo debe ap...

Page 42: ...a bomba auxiliar colocada seg n como se instal 10 Si la bomba de sumidero principal no tiene una v lvula de retencion instalada en el tubo de descarga instale una ahora 11 Corte un trozo de tubo de de...

Page 43: ...os v lvulas de seguridad deben estar instaladas en la parte de la bomba del conector en Y V lvula de seguridad FP0026 10 se compra por separado Tubo ascendente de PVC de 1 1 2 cortado para la conexi n...

Page 44: ...ada Si la bater a tarda demasiado trate de reiniciar el cargador una o dos veces presione los botones System Test prueba del sistema y Silence Alarm apagar alarma juntos para reiniciar el cargador CAR...

Page 45: ...sibles a la polaridad Conecte los cables del interruptor de flotador a las leng etas del Interruptor de flotador en el cargador controlador 6 Pruebe el flotante y la bomba levantando y sosteniendo el...

Page 46: ...bater a est entre 0 y el 20 3 Sonido de pitido r pido parpadeo r pido de LED la bater a est muy descargada La bater a continuar carg ndose siempre que la CA de 115 V hacia el cargador est conectada a...

Page 47: ...ALERT alerta del sistema parpadea mientras el interruptor de flotador est activado indicando que la bomba deber a encenderse en 3 segundos La luz LED AC POWER alimentaci n de CA est encendida fija o...

Page 48: ...controlador no est n invertidas El cargador estuvo cargando a un nivel muy bajo para tratar de poner en funcionamiento a una bater a inactiva pero la bater a demor mucho tiempo en cargarse Trate de r...

Page 49: ...ion y de que est funcionando entre la descarga de la bomba principal y el conector en Y de la bater a auxiliar Revise que no haya obstrucciones en el tubo de descarga La altura y o longitud del tubo d...

Page 50: ...e alimentaci n cable RJ45 de 1 m U117 1568 9 Soporte para interruptor PS17 2004 Si la bomba presenta fallas reemplace todo el sistema Se vende por separado AVISO Todas las v lvulas de retencion deben...

Page 51: ...lar la garant a Tenga en cuenta tambi n que los motores trif sicos deben tener la protecci n de rel s de sobrecarga de disparo extrarr pido con compensaci n ambiental de tres etapas del tama o recomen...

Page 52: ...slyimprovingourproductsandservices Pentair reservesthe right tochange specificationswithout prior notice Pentairisanequal opportunityemployer HYD979 06 08 20 2020Pentair AllRightsReserved US 293 WRIGH...

Reviews: