24 FOUR: COMPLETE
4
Mount the tape guide (N2) to the box
housing through the pre-drilled holes,
using the tek screws (J2) provided.
If your tape exits the back of the box
housing, mount the tape guide to the
back of the box housing.
If your tape exits the back of the box
housing, mount the tape coiler to the
back of the guide rail.
6. Determine which end of the box
housing (A) the tape coiler (N1) is on.
7. Mount the tape coiler (N2) to the
guide rail (C). The tape coiler should
be mounted to the guide rail at a
comfortable height with the tape coiler
mounting legs flush to the outside of
the guide rail.
Mount the tape coiler to the guide rail
using the tek screws (J2) provided.
To operate the shutter, pull the tape in
the upwards direction so that the tape
goes into the box housing (A). To open
the shutter, pull the tape out of the box
housing and down to the tape coiler.