background image

6

 

Figure 5 

Rough-in Specifications Peninsula Installation – 1 wall – Side plumbing from the floor  

(Reference figure 1) 

 

Figure 6 

Rough-in Specifications Peninsula Installation – 1 wall – Side plumbing from the back wall 

Summary of Contents for Cascade Alcove

Page 1: ...a NE 68818 360745A Revision A 10 26 07 1 866 PENNERS 1 866 736 6377 1 800 732 0717 E mail Address pennersales hamilton net Web Site www pennercareinc com ALCOVE with AQUA AIRE Installation Assembly In...

Page 2: ...9 HOT AND COLD WATER SUPPLY REQUIREMENTS 10 ELECTRICAL REQUIREMENTS 10 UNPACKING THE TUB 12 WATER SUPPLY HOSE CONNECTIONS 11 ANCHORING THE TUB ALCOVE INSTALLATION 2 OR 3 WALLS 11 ANCHORING THE TUB PEN...

Page 3: ...n the tub Meaning Safety warning Failure to understand and obey this warning may result in injury to you or to others Meaning Failure to follow these instructions may cause damage to parts or systems...

Page 4: ...4 4 Figure 3 Basic Dimensions Cascade Alcove...

Page 5: ...select the best method of connection and if Reduced Pressure Zone Backflow Preventers are required Rough in Specifications Alcove Installation 2 or 3 walls and Peninsula Installation 1 wall end Figur...

Page 6: ...igure 5 Rough in Specifications Peninsula Installation 1 wall Side plumbing from the floor Reference figure 1 Figure 6 Rough in Specifications Peninsula Installation 1 wall Side plumbing from the back...

Page 7: ...ree different options for roughing in the drain pipe from the floor from the side wall and from the back wall The connections for those two options are shown in figures 7 8 It is required that a licen...

Page 8: ...8 8 Figure 8 Drain pipe from the wall...

Page 9: ...supply pressure 145 PSI Maximum dynamic maintained supply pressure 81 PSI Maximum supply Hot water temperature Consult local requirements for maximum allowed supply temperatures Not recommended over...

Page 10: ...o place Then connect the conduit to the tub s field wiring box and make the final wiring connections after the tub is in place A licensed electrician is required to make all electrical connections Fig...

Page 11: ...or pipe sealant to make the male thread connections The supply hose to tub connection uses a gasket to make the seal so no thread tape or sealant is needed Note Two inch female x female couplers have...

Page 12: ...e block or whatever it might be Counter sink or counter bore the anchors into the wood to ensure that the anchors do not protrude out from the surface of the anchor board 4 Carefully slide the tub int...

Page 13: ...ected to the supply valves 2 If the drain connection is to be made with a rubber coupler it may need to be in place loosely on the drain pipe prior to moving the tub into place 3 Carefully slide the t...

Page 14: ...wire of the tub Connect the neutral wire normally white to the white wire of the tub Connect the ground wire normally green or yellow green to the green and yellow wire of the tub These connections c...

Page 15: ...on as long as you push and hold the buttons 7 If any leaks are found tighten the connection to stop the leak 8 Open the tub drain and check the drain system for any leaks and fix if needed 9 Slide the...

Page 16: ...ur nearest distributor contact PENNER PATIENT CARE INC Box 523 102 Grant St Aurora NE 68818 1 866 PENNERS 1 866 736 6377 1 800 732 0717 E mail Address pennersales hamilton net Web Site www pennercarei...

Reviews: