10
10
It is recommended that the power wires and conduit be connected to the supply box prior to
moving the tub into place. Then, connect the conduit to the tub’s field wiring box and make the
final wiring connections after the tub is in place.
A licensed electrician is required to make all electrical connections.
Figure 10
Electrical Supply
Alcove Installation 2 or 3 walls
Or Peninsula installation – one wall – end
(Reference Figure 1)