11
11
Figure 11
Electrical Supply
Peninsula Installation – one wall – side
(Reference Figure 1)
Unpacking the tub
1.
Remove the tub from the shipping crate.
2.
Locate and save the installation parts.
3.
Remove all access doors and place them where they will not be damaged during the
installation process.
Water Supply Hose Connections
With an installation where the left side of the tub will be against a wall, connect the hot and
cold water lines to the supply valves prior to moving the tub into place. Use thread tape or pipe
sealant to make the male thread connections. The supply hose to tub connection uses a gasket
to make the seal, so no thread tape or sealant is needed.
Note: Two ¾ inch female x female couplers have been included with the tub just in case the
supply valves have male threads.
1.
Locate the provided connecting hoses (packed with the tub) and connect the male thread end
to the hot water supply ball valves.
2.
Connect the male threaded end of the other provided connecting hose to the cold water supply
ball valve.
Anchoring the Tub – “Alcove Installation” (2 or 3 Walls)
This anchoring procedure describes the steps for anchoring the tub in a 2 or 3 wall type
installation as shown in figure 1 under “Alcove Installation”.