500714-001 - Product Manual - #FT-C70 Carbon Fiber Fall Arrest Tower - Revision 02 - 2015-03-06
Page 15
Figure #5.2d:
#FT-C70
Completely Installed
!WARNING!
- The user must ensure that
all pins & fasteners are in their “locked” posi-
tions, that the tower is completely vertical,
and that the base system (plate) is correctly
installed in order to prevent death or injury to
the user or damage to the product!
cracks, or fractures.
b.
Ensure that all product rating & warning labels are clear and legible.
c.
Ensure that the Tri-Ring Anchor Point rotates smoothly and has not been damaged.
d.
All hardware (Pins, Leveling Screws) have not been damaged and are in working condition.
2. Setup of #FT-C70 Composite Fall Arrest Tower:
Choose a location where installation will provide suitable proximity to the work area yet minimize obstructions during
use and in the event a rescue is necessary. Once a location is chosen;
Leveling
Pegs
Figure #5.2c:
#FT-C70
Tower Vertical and Secured to Structure
Figure #5.2b:
#FT-C70
Base Pin
5.0 - Product Operation (continued)
a.
Align the holes of the tower with the holes of the base plate and
pin to secure the two (Refer to Fig. #5.2b).
b.
After the tower and base plate have been connected, securely
install the tower base to the structure.
c.
The tower must adjusted to vertical using the leveling screws (Refer
to Fig. #5.2c).
d.
Once the tower is completely vertical, a Lanyard or an SRL device
can now be attached to the Anchor Point.
e.
Disassembly is reverse of assembly steps.