![Pegasus 22-15-2094 Translation Of Original Operating Instructions Download Page 59](http://html1.mh-extra.com/html/pegasus/22-15-2094/22-15-2094_translation-of-original-operating-instructions_1521833059.webp)
MY22P01 - 22_1.0_22.08.2021
58
Assembly
5.3
Commissioning
Only trained specialist staff may perform initial
commissioning since initial commissioning of the
pedelec requires special tools and specialist
knowledge.
Experience has shown that a pedelec which has
not yet been sold is automatically handed to
customers as soon as it appears ready to ride.
It makes sense to prepare each pedelec so that
it is fully ready for use immediately after being
assembled.
The assembly report (see Section
11.2
)
describes all safety-relevant inspections, tests
and maintenance tasks.
All assembly work must be completed to
ensure the pedelec is ready to ride.
Complete an assembly report to document
quality assurance (see Section 11.1).
5.3.1
Checking the battery
The battery must be checked before it is charged
for the first time.
Press the
On-Off button (battery)
.
If none of the LEDs on the battery level
indicator light up, the battery may be damaged.
The battery may be fully charged if at least one,
but not all, of the LEDs on the battery level
indicator is lit up.
Summary of Contents for 22-15-2094
Page 196: ...MY22P01 22_1 0_22 08 2021 195 Notes...
Page 207: ...MY22P01 22_1 0_22 08 2021 206 Documents D Compact Charger A G A C EBE D F...
Page 208: ...MY22P01 22_1 0_22 08 2021 207 Documents D EBE D F A G A C...
Page 209: ...MY22P01 22_1 0_22 08 2021 208 Documents D A G A C EBE D F...
Page 210: ...MY22P01 22_1 0_22 08 2021 209 Documents D EBE D F A G A C...
Page 219: ...MY22P01 22_1 0_22 08 2021 218 Appendix II Declaration of conformity for incomplete machine...
Page 220: ...MY22P01 22_1 0_22 08 2021 219 Appendix...