Installation

Generator Environment

The generator is designed for indoor use only. It should be installed adjacent to the 

application it is supplying. If this is not convenient then the unit can be sited elsewhere, 

however, consideration should be made of the lengths of pipe runs as pressure drops 

can result from extended runs of pipe. 

Performance of the generator is affected by ambient conditions. Note should also be 

taken to the proximity of Air Conditioning outlets. These can sometimes give rise to 

“pockets” of air with high relative humidity. Operation of the unit within such a pocket 

could adversely affect its performance. Consideration should also be given to the air 

flow around the unit. We recommended that an air gap of 100mm (3.9”) should be 

maintained down both sides and at the rear of the unit. Refer to the drawing on the 

following page for the general dimensions of the unit.

Ensure Generator is situated in a well vetilated environment and is positioned to allow 

easy disconnection from the mains supply if required

Minimum Operating Ambient Temperature: 

 5 °C (41 °F)

Maximum Operating Ambient Temperature: 

30 °C (86 °F)

Summary of Contents for Genius XE SCI 2

Page 1: ...Genius XE SCI 2 User Manual Rev 11 RSID 3607 EN November 2021 Genius XE SCI 2 User Manual...

Page 2: ...12 Installation 13 Generator Environment 13 Generator Overview 14 General Dimensions 14 Genius XE SCI 2 Rear Connections 15 Unit Controls 15 Drain Connection 16 Electrical Connection 17 Start Up Sequ...

Page 3: ...ttie 18 11 2021 How to use this Manual This manual is intended for end users and has been written as a reference document where you can skip to the relevant information Users can refer to the contents...

Page 4: ...ality of the foregoing that any defect is not the direct or indirect result of lack of repair and or servicing incorrect repair and or servicing use of wrong materials and or incorrect spare parts 2 A...

Page 5: ...ted conditions are fully understood or met A CAUTION notice denotes a hazard It calls attention to an operating procedure process or similar which if not correctly performed or adhered to could cause...

Page 6: ...EU EN 61010 1 2010 Safety Requirements for Electrical Equipment for Measurement Control and Laboratory Use Electromagnetic Compatibility Directive 2014 30 EU EN 61326 1 2013 Electrical Equipment for M...

Page 7: ...Equipment Safety Regulations 2016 SI 2016 1101 as amended BS61010 1 2010 Safety Requirements for Electrical Equipment for Measurement Control and Laboratory Use The Electromagnetic Compatibility Regul...

Page 8: ...Guidance Notes PDF produced by the Department for Business Innovation and skills for the UK and here for Europe All PEAK products that are subject to the WEEE directive are compliant with the WEEE mar...

Page 9: ...e certified to the current in force revision of the following standards in order to cover both Canadian and United States requirements for Safety Requirements for Electrical Equipment for Measurement...

Page 10: ...Maximum Flow Up to 32L min 7 24bar 1 13cfm 105psi Exhaust Maximum Flow Up to 25L min 4 83bar 0 88cfm 70psi Particles 0 01 m Phthalates NONE Suspended Liquids NONE Gas Outlets 1 5 16 nitrogen 2 BSPP ai...

Page 11: ...the Peak Partner from where the unit was purchased Follow the unpacking instructions posted on the side of the crate It will require two people to remove the unit from the shipping crate and to manoe...

Page 12: ...1 1 4 Teflon Tubing 3m 3 2 5 16 Teflon Tubing 3m 1 3 6mm PE Tubing 3m 1 4 1 4 Compression Fitting 3 5 5 16 Compression Fitting 1 6 6mm Push Fit Fitting 1 7 Flow Control Silencer 3 8 UK Mains Power Cab...

Page 13: ...ng outlets These can sometimes give rise to pockets of air with high relative humidity Operation of the unit within such a pocket could adversely affect its performance Consideration should also be gi...

Page 14: ...4 Generator Overview General Dimensions The generator must always be placed on a flat level surface Failure to do so will affect the performance of the generator WARNING 570 mm 22 4 897 mm 35 3 700 mm...

Page 15: ...ll connections should only be carried out by trained personnel Generator must be switched off and unplugged prior to any cleaning or maintenance operations Unit Controls Service LED Yellow WARNING WAR...

Page 16: ...tubing to connect this to a suitable drain connection or container It should be noted that the Generator can expel a considerable amount of water from this dependant on ambient humidity If a containe...

Page 17: ...e generator or risk overloading of the power cord This unit is classified as SAFETY CLASS 1 THIS UNIT MUST BE EARTHED Before connecting the unit to the mains supply check the information on the serial...

Page 18: ...is reached the compressors will continue to run until the internal tank upper pressure limit is reached and the compressor has run for a period of at least two minutes The compressors will then rest u...

Page 19: ...n the gas supply between the generator and the application can lead to a reduction in efficiency Tubing Lengths The diameter of the tubing which will be connected to the gas outlets is important and i...

Page 20: ...enerator is designed to operate in either a cyclic mode or run continuously this will be dependent on the output flow The cyclic rate of the compressors will depend on the gas demand of the applicatio...

Page 21: ...onths Genius XE SCI 2 Annual Maintenance Kit www peakscientific com ordering 4 Years Genius XE SCI 2 Year 4 Service Kit www peakscientific com ordering Quote your generator serial number when ordering...

Page 22: ...the LED on Stage 2 If the service is not completed the generator will continue to run After 4 weeks the service LED indicator yellow will start to flash This is to make the user aware that the service...

Page 23: ...to install and setup your generator IQ OQ Certified assurance for applications requiring documented qualification Complete plan Swift response by a Peak Service Engineer within 72 hours planned preve...

Page 24: ...e cloth prior to use Cleaning should only be undertaken with the power switched off and the power cord removed from the rear of the generator Under no circumstances should any solvents or abrasive cle...

Page 25: ...re is not building Contact your service provider The mass spec is reporting low pressure Contact your service provider Yellow SERVICE LED on front panel is on constantly A compressor s due for service...

Page 26: ...ic com For generators that remain unregistered after 1 month from the shipment date the warranty will be considered active from the date of factory dispatch Complete Plan only Go Online or Complete an...

Page 27: ...Page 27...

Page 28: ...Page 28...

Page 29: ...y leading rapid response service to our customers With Peak Protected your laboratory s productivity becomes our top priority To discuss Peak Protected generator cover and payment options speak to you...

Reviews: