39
VII. MAINTENANCE SCHEDULE
Monthly:
1.
Re-torque the anchor bolts to 150Nm;
2.
Lubricate cable with lubricant;
3.
Check all cable connection, bolts and pins to insure proper mounting;
4.
Make a visual inspection of all hydraulic hoses/lines for possible wear or leakage;
5.
Lubricate all Rollers, Safety devices with 90wt. gear oil or equivalent.
Note:
All anchor bolts should take full torque. If any of the bolts does not function
for any reason, DO NOT use the lift until the bolt has been replaced.
Every six months:
1.
Make a visual inspection of all moving parts for possible wear, interference or
damage.
2.
Check and adjust as necessary, equalizer tension to insure level lifting.
3.
Check columns for plumbness.
Summary of Contents for 409A
Page 1: ...0 FOUR POST LIFT Model 409A A440A ...
Page 9: ...7 D Install cross beams See Fig 11 Fig 12 3 1 3 Fig 12 Hole towards inside 2 Fig 11 ...
Page 33: ...31 IV EXPLODED VIEW Model 409A A440A Fig 46 13 74 Optional turnplates ...
Page 34: ...32 CROSS BEAM CYLINDERS Fig 47 Fig 48 3 ...
Page 35: ...33 CONTROL BOX SPX ELECTRIC POWER UNIT 220V 50HZ single phase Fig 50 Fig 49 Fig 50 ...
Page 50: ...8 72114302 12 2015 ...