![PDR D2 Operator'S Manual Download Page 23](http://html.mh-extra.com/html/pdr/d2/d2_operators-manual_1516834023.webp)
www.pdr-rework.com
Operating Procedures
Preparation
The procedure while preparing to rework SMT/BGA components is as follows,
Switch on and warm up
Select 'profile' required for PCB/component
Thermocouples
Select lens attachment and set lens spotsize
Sort tools and fluxes required
Switch on and warm up
The following simple procedure will warm the system up
a.
Switch on the PDR T5 Controller, Lightbox and PC
b.
Allow system to warm up - 5 to 10 minutes
Selecting a Profile to use
The following simple procedure will get you started,
a.
Press 'open' - bottom left in control panel
b.
Select required PCB - this is the 'folder' containing your component profiles
c.
Select component - the 'filename.lmd' within the opened folder
Main Control Panel