1x230 V
~
(1x32A)
Single phase
1x230 V
~
(2x16A)
Dual phase
1x230 V
~
(3x16A)
Three phase
An IEC certified bushing that will maintain the IPX5 rating must
be used. The power cord must be in accordance with the national
electrical code of the country in which the in.xm.ce is to be installed.
Dual phase system: two electrical phases out of a three-phase power
system. It’s important to note that on a polyphase power system,
all electrical phases must share the same neutral.
Make sure all accessories are linked to the bonding connector and
connected to the pack. Electrical connections should be made only by
qualified personnel and in accordance with local regulations.
To install the wiring for the in.xm.ce spa control, you’ll need a Phillips screwdriver, a 14 mm (9/16”) nut
driver or a flat screwdriver. Loosen the 2 screws of the spa pack door and open it. Remove 200 mm (8”)
of cable insulation. Strip away 25 mm (1”) of each wire insulation. Pull the cable through the cutout of
the box and use an IEC certified plastic bushing that will maintain the IPX5 rating. Also, the power cord
must be in accordance with the national electrical code of the country in which it’s to be installed and
must maintain IPX5 rating. Make sure that only the uncut sheathing is clamped at this opening. Push the
color-coded wires into the terminals as indicated on the sticker, use the 14mm (9/16”) wrench or flat
screwdriver to tighten the bolts on the terminals. After making sure wire connections are secure, push
them back into the box and close the door. Tighten the 2 screws of the spa pack door.
Connect the bonding
conductor to the bonding lug
on the left side of the
in.xm.ce spa pack (a grounded
electrode conductor shall be
used to connect the equipment
grounding conductors).
Bonding lug
When installing the in.xm.ce power box we recommend the following:
28
Wiring Installation—EXPORT GUIDELINES in.xm ce
Standard with 800 Series
control on all LX Series Units
In.XM Platform Control Center
1 x 230 V~ (1 x 32A) single phase,
or
1 x 230 V~ (2 x 16A) dual phase,
or
1 x 230 V~ (3 x 16A) three phase
All installations and connections are to be performed by a qualified, licensed electrician only and in accord-
ance with local regulations. Identify the correct CE platform on the spa unit, in accordance with the home’s
electrical output, and follow the guidelines below. Ensure power is turned off prior to making any electri-
cal connections.
This product must always be connected to a circuit protected by a residual-current device (RCD) having
a rated operating residual-current not exceeding 30 mA. Proper wiring of the electrical service box, RCD
and in.xm.ce terminal block is essential! Check your electrical code for local regulations. Only copper
wire should be used, never aluminum.
!
Warning!
INSTALLATION GUIDELINES for IN.XM CE
Wiring Installation—EXPORT GUIDELINES in.xm ce
Summary of Contents for Aruba LX
Page 1: ...1 800 451 1420 www pdcspas com Owners Manual revised 02 2016...
Page 2: ......
Page 51: ......