![PCM FW5 FloW Building Instructions Download Page 7](http://html1.mh-extra.com/html/pcm/fw5-flow/fw5-flow_building-instructions_1516304007.webp)
FW5 FloW Building Instruction Juni 2010
5. Installation of the CFR-stab
Sand the rudder
wedge-shaped
on the
hinge line
, so that
you can move it in both directions. Note that the
hinge line
must be placed
on the left side
(looking towards flight
direction) for
right-handers
and the other way round for left-
handed persons.
Next, glue the
lever
in extension of the axis of the boom. The
hole of the lever
should be
above the hinge line
.
Before you fix the control surface of the rudder with
adhesive
tape
, put some
UHU-por
on the gluing spots to improve the
gluing force of the tape.
Spread the UHU-Por with your finger.
www.pcm.at
7