![PCM ERWIN XL slope Building Instruction Download Page 6](http://html1.mh-extra.com/html/pcm/erwin-xl-slope/erwin-xl-slope_building-instruction_1516302006.webp)
Erwin XL
slope
building Instruction
August 2018
www.pcm.at
6
ASSEMBLING THE MODEL
5. V-tail
The v-tail is ready prepared with holes for screws to be
fixed on the fuselage.
Controlling of the elevator:
Bend two
brass levers
as shown below and glue the
ball
connectors
to one end each. Then
glue the levers to the
control surfaces
of the elevator. The gluing spot should
be as near as possible to the turning axis of the controls
(silicone hinge).
Ready mounted levers with ball connectors.
(Here to be seen on Erwin XL ultralight)