background image

Address:East Room 306,3th Floor,1st Building,Shenhua Industrial Park,Meihua Road, Futian District,Shenzhen City

Tel:0755-32978297

Email:[email protected]

Manual

4.3.1

Signal strength (level)

In the middle of the display, a bar graph is displayed depending on the received signal strength. A
numerical value of the received signal strength in dB will also appear in the upper-left corner of the
display. The max. level to be displayed is 60 db.

4.3.2

Volume/ sensitivity

The selected volume/ sensitivity will appear on the right side in a bar with up to 16 steps.

4.3.3

Battery level

On the bottom left, a battery symbol is displayed with a battery level bar. The current battery voltage in
volts is also displayed below it.

4.4

Battery charging

The battery is charged within the device. For this, the supplied plug-in power supply is connected to the
built-in charging socket of the PCE-LDC 10 and the 230V socket.

If the battery is sufficiently charged, the status LED will flash green after the connection of the

power supply and no additional charging will be performed.

If the charge state of the battery is too low, the charging process will automatically start and the

LED will light up red. The charging is automatically discontinued after the battery reaches its full
capacity. The LED will then be permanently illuminated in green.

Comment:

During the charging, the unit will not be operational. Additionally, it cannot be switched on during the
charging process. A switched on device will automatically switch off if the power supply for the battery
charging is connected.

4.4.1

Deep discharge protection

The battery pack has a protection for deep discharge and turns off at 6V.

7

Summary of Contents for PCE-LDC

Page 1: ...1st Building Shenhua Industrial Park Meihua Road Futian District Shenzhen City Tel 0755 32978297 Email hj pce instruments cn Manual Leakage detector PCE LDC 10 Version 1 0 Date of creation 08 09 2015...

Page 2: ...ents and controls 4 4 1 1 The front side 4 4 1 2 Sensor head 4 4 1 3 Accessories 5 4 2 Commissioning 6 4 2 1 Switching on 6 4 2 2 Louder quieter 6 4 2 3 Laser 6 4 3 Display 6 4 3 1 Signal strength lev...

Page 3: ...ones In case of high signal levels bar graph in the red zone the volume can be correspondingly high The volume can be reduced with the help of the sensitivity adjustment Please maintain a sufficient s...

Page 4: ...Email hj pce instruments cn Manual 4 System description 4 1 Device components and controls 4 1 1 The front side 1 2 TFT color display 2 LED status display 3 Volume sensitivity increase 4 Laser on off...

Page 5: ...detection of the leak Through its special design the integrated laser pointer will remain usable The sound cone is simply placed onto the sensor head and slightly twisted until the latch head reaches...

Page 6: ...volume in the sensitivity can be increased or respectively decreased in 16 steps By pressing and holding the respective button the value will automatically increase or decrease 4 2 3 Laser The integra...

Page 7: ...ng The battery is charged within the device For this the supplied plug in power supply is connected to the built in charging socket of the PCE LDC 10 and the 230V socket If the battery is sufficiently...

Page 8: ...pes unused Large openings can be detected easily you can clearly hear the hissing sound but often holes smaller than 1 mm2 remain undetected because they cannot be heard The PCE LDC 10 is perfectly su...

Reviews: