26
III.8 Measurement of Maximum Demand
1. Set the time interval for maximum demand (refer to section VII)
2. The analyzer will integrate the KW and KVA over the specified interval.
3. The maximum demand (MD) will be updated if new demand is greater
than the previous value.
In the following example, the maximum demand is 527.4VA and 527.4W. The time
interval for maximum demand is 2 minutes.