The me
means t
connect
To avoid
The jaws
connectio
the output
Follow a
Follow a
Obey po
Never a
Always
Remove
Make co
Connec
Route te
II. INTRODUCT
The symp
equipment
decreased
Use powe
running,
harmonics
optimal up
10 displa
time.
4 curren
Measure
All True
KVAh m
Phase se
Backligh
Manual
Data log
RS-232
Easy-to-
Light we
easurement in
that the other
both termina
electrical sh
of alligator
ns to feeder c
t side of a cir
all legal requ
all instruction
osted instruct
ssume that a
set up the me
e all test leads
onnections to
t the ground
est leads care
TION FEATUR
ptoms of po
t failure, ove
productivity
er analyzer
troubleshoot
s, optimize
pgrades.
ay Easy-to-vi
nt probe inclu
es single-phas
e-RMS sensin
measurement
equence indic
ht display fun
Data Memor
gging (504K b
optical interfa
-use key oper
eight and por
nput and syn
r is exposed
als.
hock and / or
clips can cr
conductors o
cuit breaker a
uirements.
ns in the man
tions.
circuit is de-e
easurement fi
s that are not
o the meter fir
lead first, th
fully.
RE
oor power q
er-heating of
and frustrate
to power q
t problems
power syste
iew LCD scre
ding for mea
se 2-wire, sin
ng , V, A, KW
s.
cator function
nction.
ry and Read (
byte memory
face with three
ration.
rtable design.
nchronizing i
it is live, and
r meter dama
reate a sho
or bus bars
as possible as
nuals.
energized, ch
irst, then conn
in use.
rst, before con
hen the voltag
quality includ
f components
ed personnel.
quality troub
quickly, im
em performan
een, and is ca
suring a neut
ngle-phase 3-w
W, KVAR, KV
n.
99 sets).
y, 12,000 sets
e phase voltag
CAUTION
input are not
d there is a d
WARNING
age, use caut
ort circuit be
at elevated
s you can, wh
heck it first.
nect the test l
nnecting lead
ge leads and
de intermitte
s for no appa
le shooting
mprove powe
nce, improve
apable of show
tral line curren
wire, three-ph
VA, PF,
θ
, Hz,
per block, to
ge / current w
N
t isolated fro
danger of ele
G
tion when co
etween close
d potentials. W
hich can provi
leads to the ci
ds to a live cir
the current p
ent lock-ups
arent cause,
can help y
er efficient,
e power qual
wing many p
nt.
hase 3-wire a
KWh, KVAR
tal 20,000 set
waveform disp
i
om each othe
ctric shock.
onnecting test
ely spaced li
Whenever, pl
ide better sho
ircuit.
rcuit.
probe, Discon
and resets,
etc. The ulti
you keep yo
manage en
lity and analy
ower quality
and three-pha
Rh and
ts).
play and harm
info@tursdaletec
er. Connecti
To avoid ele
t leads to live
ive parts. A
lease make c
ort circuit pro
nnect in rever
corrupted da
imate cost is
ur power sy
nergy costs,
yze system d
parameters a
se 4-wire sys
monic analysi
chnicalservices.co
ing either on
ectrical shock
e components
Avoid makin
connections t
otection.
rse order.
ata, prematur
s in downtim
ystem up an
zero in o
data to desig
at the same
stems.
is.
o.uk
5
ne
k,
s.
ng
to
re
e,
nd
on
gn