A : Line, N : Neutral, G : Ground,     Face the arrow toward the load. 

 

 

 

1P2W Wiring Connection Diagram 

 

1. Press 

key to turn on the meter. 

2. Press WIRING key to select the 1P2W electrical system under test, the 1P2W annunciator will be displayed. 
3. Connect the voltage test leads and current probe to the meter. 

 Connect the black voltage test lead to the “N” terminal. 
 Connect the red voltage test lead to the “U1” terminal. 
 Connect the I1 current probe output plug to the “I1” jack. 
 If you want to measure ground leakage current, connect the I4 current probe output plug to the “I4” jack. 

4. Connect the voltage test leads and current probe to the electrical equipment to be tested. 

 
 

CAUTION

 

 If possible, before connecting the voltage test leads and current probe to the electrical equipment to be 

tested, take off the electrical equipment’s power. 

 

 Connect the black voltage test alligator to the Neutral Line “N”. 
 Connect the red voltage test alligator to the Line “A”. 
 Press I1 current probe trigger to open the jaw and fully enclose the Line “A”.   If you want to measure ground 

leakage current, press I4 current probe the trigger to open the jaw and fully enclose the Ground Line “G”. 

5. Frequency (Hz), Phase Angle (

Θ

 ), Ground Leakage Current (I4) and Power 

Factor (pF) measurement : 

 Hz : Press “Hz” key, PF1 will show “Hz”.  Press “PF” key to exit. 
 

Θ

  : Press “

Θ

 ” key, PF1 will show “

ψ

”.  Press “PF” key to exit. 

 

 I4 : Press “I4” key, PF1 will show “I4”.  Press “PF” key to exit. 
 pF : Press “PF” key. 

 

6. Energy measurement: 

 Press “ENERGY” key, the “Pt”, “Qt”, “St” and “PFt” or “

ψ

t” annunciator 

and energy integrate start time are displayed.  The energy integrate value and the current time will be continuous 
accumulate. 

a). KW displays KWh 

 

b). KVAR displays KVARh c). KVA displays KVAh 

Summary of Contents for PCE-360

Page 1: ...le Technical Services Ltd Unit N12B Tursdale Business Park Co Durham DH6 5PG United Kingdom Phone 44 0 191 377 3398 Fax 44 0 191 377 3357 info tursdaletechnicalservices co uk http www industrial needs...

Page 2: ...2 Wire 1P2W Power System Measurement 17 5 3 Single Phase 3 Wire 1P3W Power System Measurement 20 5 4 Three Phase 3 Wire 3P3W Power System Measurement 23 5 5 Three Phase 4 Wire 3P4W Power System Measu...

Page 3: ...is manua affixed to th ng relevant f tes explanat meter ges ected throu use only s 61010 1 2n n and warni ing conditio DANGE ncorrect me ter Please e meter DANGE ey look dam around ba ric shock t exce...

Page 4: ...osed to allow the mete cuits take a rubber glove e power off b ck and short measured to th on presents ex erious injury ation presents o the user ion presents p erformance o maximum perf CAUTI be safe...

Page 5: ...as possible as nuals energized ch irst then conn in use rst before con hen the voltag quality includ f components ed personnel quality troub quickly im em performan een and is ca suring a neut ngle ph...

Page 6: ...0 minut on the BT i me Auto off a ox 1 time pe onic analyzer pening diamet re 0 C to 40 Maximum re 31 C decrea 40 C non co ent 0 1 sp and humidity 235 L 117 probe 193 ng battery e approx 3 ement Categ...

Page 7: ...error measuremen Accuracy 0 3 rdg 10dg 50V S voltage val Measureme Accuracy luding current p 0 5 rdg 15dg 3A S current valu T ADAPTOR II 600V per IE Edition and IE mum Output i Co Ltd II 1000V AC Ent...

Page 8: ...nels Polarity display For phase lag LAG current is slower than voltage No symbol For lead phase LEAD current is faster than voltage Power Factor measurement COS Range Resolution Calculated Accuracy 0...

Page 9: ...9KVAh 0 1KVAh 3 999MVAh 0 001MVAh 39 99MVAh 0 01MVAh 119 3MVAh 0 1MVAh Measurement display Display all apparent power energy sum of absolute values Reactive Power Energy measurement Kvarh Range Resol...

Page 10: ...info tursdaletechnicalservices co uk 10 IV PARTS CONTROLS 4 1 Description of Parts Control keys...

Page 11: ...ode for auto d e and time co current data and time or r gging function ing function a memory con play reading ber is display mory data cont easured powe d in cycles ntegrated pow unctions key ciator i...

Page 12: ...measured display indication KW Active power unit KWh MWh Active energy unit PF1 Phase 1 power factor measured display PF2 Phase 2 power factor measured display PF3 Phase 3 power factor measured displ...

Page 13: ...ement fi to the instrum lead first th s that are not ured display ase 3 reactive display indicat it ured display ase 3 apparen display indica Apparent ene tion yed me setting ind me indication indicat...

Page 14: ...or loose s uit with voltag king around b h voltages ab Warning k or personal i e Current Cla er and for loo y particular nt Clamp If e Current Cla ndicular to the sure the con es when maki ose to othe...

Page 15: ...g the load on a ng the load on a t Adaptor re able to the ins of the clamp clamp jaws ar W personal injur Wire 1P2W ranch circuit cal distribution tage rent monics use PC monics use PC veform use PC e...

Page 16: ...eads and current probe to the electrical equipment to be tested take off the electrical equipment s power Connect the black voltage test alligator to the Neutral Line N Connect the red voltage test al...

Page 17: ...nected to voltage source during the measurement of U2 U3 I1 I2 and I3 because U1 is the main signal source of the whole meter measuring system Otherwise you could not have any measurement from U2 U3 I...

Page 18: ...nnect the I4 current probe output plug to the I4 jack 4 Connect the voltage test leads and current probe to the electrical equipment to be tested CAUTION If possible before connecting the voltage test...

Page 19: ...urement Press ENERGY key the Pt Qt St and PFt or t annunciator and energy integrate start time are displayed The energy integrate value and the current time will be continuous accumulate a KW displays...

Page 20: ...voltage and current waveforms become distorted causing voltage drops they can cause voltage unbalance reverse phase to neutral voltage and harmonics may cause accidents such as uneven motor rotation...

Page 21: ...key to select P1 Q1 S1 PF1 P2 Q2 S2 PF2 and Pt Qt St PFt measured values 6 Frequency Hz Phase Angle and Power Factor pF measurement Hz Press Hz key PF1 will show Hz Press PF key to exit Press key PF1...

Page 22: ...voltage test lead to the U2 terminal Connect the blue voltage test lead to the U3 terminal Connect the I1 current probe output plug to the I1 jack Connect the I2 current probe output plug to the I2 ja...

Page 23: ...ess Hz key PF1 will show Hz Press PF key to exit Press key PF1 will show Press PF key to exit I4 Press I4 key PF1 will show I4 Press PF key to exit pF Press PF key 7 Energy measurement Press ENERGY ke...

Page 24: ...info tursdaletechnicalservices co uk 24 5 6 Only One Current I4 Measurement Application Measurement any wire current independent of voltage the same as clamp meter application...

Page 25: ...ear memory data Please refer to software manual CD ROM use PC to clear memories data the meter can not clear memories data free from lost memories data 2 Store Auto datalogging data to memory Setting...

Page 26: ...m wn HOLD ke auto power of de is enabled e n is active function is ac ent er W mode the meter ad to the U1 t lead to the ead to the U3 the electrical ng the voltage equipment s igator to the p t allig...

Page 27: ...isconnect all test leads and current probe from any power electrical source press key to turn off the meter and remove the test leads from the jacks 3 The battery cover is secured to the bottom case b...

Reviews: