5.2 Setting up the FMC/E
Before measuring can start, the measuring electrode has to be connected and the
meter set for the material and temperature in question. Depending on the type of
electrode, sections 5.2.1 to 5.2.4 contain instructions for connecting the electrode.
5.2.1 Connecting the Ram electrode / handle electrode
)
Install the battery as described in section 5.1
)
Unscrew the swivel nut from the electrode with the spanner
supplied with the meter.
)
Insert the measuring pin into the swivel.
)
Slide the swivel nut over the measuring pin and screw it tight.
)
Repeat the above for the second measuring pin.
)
Attach the plug for the measuring cable to the electrode
connector. Make sure the groove in the plug slides over the
tips of the connector.
)
Turn the plug’s metal housing clockwise until it locks into the
connector.
)
Attach the other end of the measuring cable to the FMC/E in
the same way.
)
Insert the electrode measuring pins into the material being
measured by hitting them into the material. Hold the electrode
at the top and straight over the wood.
The meter is now ready for setting (see section 5.3)
Summary of Contents for Brookhuis FMC
Page 25: ......