background image

 

PCB Load & Torque, Inc.   

 Toll-Free in USA 866-684-7107   

 716-684-0001   

 www.pcbloadtorque.com

 

 

 

DUAL BRIDGE LOAD CELL OPERATION MANUAL 

 

5

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

5.0 ELECTRICAL INSTALLATION 

 
 

 
 
 
 
 

5.1 Electrical Drawing / Western Regional Std. 

All  load  cells  are  wired  following  the  Western  Region 
Standard.    All  models  utilize  strain  gages  configured  into  a 
Wheatstone  Bridge  Circuit  to  produce  the  primary  sensing 
element.  The  four-arm  Wheatstone  bridge  configuration  is 
shown below in Figure 11. 

 
 
 
 
 
 
 
 
 

The  gages  are  bonded  to  the  load  cell's  structure. 
Typically,  a  regulated  DC  or  AC  excitation  is  applied 
between A and D of the bridge. When a force is applied to 
the  load cell,  the Wheatstone  bridge  becomes  unbalanced, 
causing  an  output  voltage  between  B  and  C,  which  is 
proportional to the applied load.  This configuration allows 
for  temperature  and  pressure  compensation,  as  well  as 
cancellation  of  signals  caused  by  forces  not  directly 
applied to the axis of the applied load. Output is typically 
expressed in units of mV/V of excitation. 
 

5.2 Cable & Grounding Considerations 

Proper  grounding  and  shielding  is  required  to  prevent 
electrical  noise  in  strain  gage  load  cell  measuring  systems.  
The cable must be shielded twisted pairs with a drain wire. 
 
Cable shields must be grounded only at one end, for example, 
on  the  instrument  or  control  system  ground.    The  load  cell 
case is grounded by mechanical attachment to the structure to 
which it is mounted. 
 
The  instrument  or  control  system  is  grounded  through  its 
power cord.  Ground loops and measuring system wiring may 
result in unstable or noisy signals. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
A  simple  test  with  a  voltmeter  connected  between  the  power 
cord  ground  and  the  structure  on  which  the  load  cell  is 
mounted  can  confirm  that  the  structure  has  been  properly 
grounded.  If the power cord ground and structure ground are 
not  at  the  same  potential,  it  may  be  necessary  to  provide  a 
secure  structure  ground,  perhaps  by  driving  a  copper  rod  and 
attaching a ground strap. 
 
 

6.0 CALIBRATION 

 
Every dual bridge fatigue-rated load cell purchased from PCB 
Load  &  Torque,  Inc.  has  been  fully  calibrated  per  ISO/IEC 
17025  procedures,  and  meets  all  published  specifications.  
Each  load  cell  will  come  with  a  calibration  certificate 
designated  with  matching  model  and  serial  numbers.  PCB 
Load & Torque also offers calibration services on an on-going 
basis. 
 

6.1 Calibration Certificate Description 

Calibration  reports  supplied  with  PCB  Load  &  Torque  dual 
bridge  load  cells  contain  valuable  information  to  assist  the 
customer  in  use  of  the  equipment.  A  separate  calibration 
report is provided for tension and compression calibrations on 
each  bridge.  Calibration  procedures,  equipment,  and  reports 
comply with ISO/IEC 17025. 

Table 6

 

– Electrical Connections 

Figure 12

 

- Grounding 

 

Test Rig Ground 

Power Supply 

Instrument Ground 

Cable Shielding 

Load Cell 

 

- Signal White 

- Excitation Black 

+ Excitation Red 

+ Signal Green 

Figure 11 - Western Regional Strain Gage Committee Wiring Code 

Figure 9 - Attach the Connector 

Protector (54823-02) using #4-40 x 

3/8” Socket Head Cap Screws 

Figure 10 - Fully Assembled 

 

 

Load Cell Receptacle “A-Type”: 

PT02E-10-6P 

Mating Connector: 

PT06A-10-6S 

PCB Item No: 

181-012A 

Load Cell Receptacle “B-Type”: 

PC04E-10-6P 

Mating Connector: 

PC06A-10-6S 

PCB Item No: 

182-025A 

 

Summary of Contents for 1402-13ADB

Page 1: ...LOAD CELL DUAL BRIDGE Installation and Operating Manual For assistance with the operation of this product contact PCB Piezotronics Inc Toll free 800 828 8840 24 hour SensorLine 716 684 0001 Fax 716 68...

Page 2: ...repair User servicing or repair is not recommended and if attempted may void the factory warranty Calibration Routine calibration of sensors and associated instrumentation is recommended as this helps...

Page 3: ...ry customer service representative Warranty All equipment and repair services provided by PCB Piezotronics Inc are covered by a limited warranty against defective material and workmanship for a period...

Page 4: ...isclosure Table Pb Hg Cd Cr VI PBB PBDE O O O O O O PCB X O O O O O O O O O O O X O O O O O O O O O O O O O O O O O O O O O O O O O X O O O O O O O O O X O O O O O O O O O O O X O O O O O X O O O O O...

Page 5: ...e O O X O O O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indica...

Page 6: ...6 in x 3 50 in 153 90 mm x 88 90 mm 8 Weight 21 lb 9 53 kg Mounting Thread 1 14 UNS 3B No Metric Equivalent Sensing Element Strain Gage Strain Gage Mounting Torque 1400 in lb 158 Nm Deflection at Full...

Page 7: ...10 3 12X THRU n5 125 130 2 B C 1 14UNS 3B x1 37 34 8 45 90 n2 59 65 8 1 75 44 5 n6 06 153 9 81 20 6 1 63 41 4 CONNECTOR A PTO2A 10 6P CONNECTOR WIRING CODE TYPICAL PIN A EXC PIN B SIG PIN C SIG PIN D...

Page 8: ...LECTRICAL INSTALLATION 5 5 1 Electrical Drawing Western Regional Std 5 5 2 Cable Grounding Considerations 5 6 0 CALIBRATION 5 6 1 Calibration Certificate Description 5 6 1 1 Measured Output 6 6 1 2 Hy...

Page 9: ...the parts under test have completed the planned fatigue test cycles 3 0 OVERVIEW Dual bridge fatigue rated load cells are specifically designed for repetitive testing Applications include material te...

Page 10: ...ote that the performance of the load cell may be affected if the factory installed mounting base is removed or modified 4 2 Mounting Load Cell to a Standard Base or Custom Fixture If the load cell is...

Page 11: ...ctor Protector 1 Remove the 4 40 x 1 4 button head cap screws from the connector using a 1 16 hex wrench as shown in Figure 7 2 Carefully pull the connector from the load cell Take care to not break o...

Page 12: ...wiring may result in unstable or noisy signals A simple test with a voltmeter connected between the power cord ground and the structure on which the load cell is mounted can confirm that the structur...

Page 13: ...s are adjusted such that the error due to eccentric loading is less than 0 1 per inch of offset Side loads moments and torque must be limited to avoid electrical or mechanical damage to the load cell...

Page 14: ...tion certificate and adjust the span or gain until the display reads the force value stated on the certificate 4 Repeat steps 1 3 to verify that a valid calibration setting has been obtained 5 If poss...

Page 15: ...ridge resistances A D excitation and B C the signal leads 9 Check bridge balance 10 Keep a record of your observations correct problems or contact PCB factory for assistance 11 2 1 Estimating Bridge B...

Page 16: ...factory for any reason For calibration services if possible a copy of the purchase order covering the requested services should be included with the returned load cell 13 0 WARRANTY Standard warranty...

Reviews: