![Paul FOCUS 200 Base Series Operating Instructions Manual Download Page 33](http://html1.mh-extra.com/html/paul/focus-200-base-series/focus-200-base-series_operating-instructions-manual_4028662033.webp)
33
Commissioning and handover protocol
Customer data
Name:
First name:
Tel.:
Street: Postcode:
Town/city:
Construction project:
Unit type:
Serial no.:
Year of construction:
Completeness
No.
Components
Implementation
Result
1
Supply air duct
- Design as planned
- Cleaning option provided
yes / no
yes / no
2
Supply air vents
- Arrangement as planned
- Design as planned
- Cleaning option provided
yes / no
yes / no
yes / no
3
Overflow air vents
- Arrangement as planned
- Design as planned
yes / no
yes / no
4
Extract air vents
- Arrangement as planned
- Design as planned
- Cleaning option provided
yes / no
yes / no
yes / no
5
Extract air duct
- Cleaning option provided
yes / no
6
Extract air fan
- Cleaning option provided
yes / no
7
Control / regulation system
- Operational
yes / no
8 Filter,
optional
- Replacement or
cleaning option provided
yes / no
9
Heat exchanger for waste heat recovery
- Cleaning option provided
yes / no
10
Documentation
- Available
yes / no
Function
1
Operational with rated ventilation, as
planned
Result OK
Action required
yes / no
yes / no
2
Switching steps possible, as planned
Result OK
Action required
yes / no
yes / no
3 Electrical
power
consumption
Result OK
Action required
yes / no
yes / no
Record of confirmation
Date: ................................. Signature/stamp:....................................................................................................
Commissioning personnel / installation technician
Summary of Contents for FOCUS 200 Base Series
Page 1: ...Version 1 1_03 2020 EN...
Page 29: ...29 Dimensions Fig 32 Dimensional drawing...
Page 30: ...30 FOCUS 200 Base terminal scheme Fig 33 FOCUS 200 Base terminal assignment...
Page 35: ...35 Product data sheet...
Page 36: ...36...