3060/X21
109001UA
P
ATON
E
LECTRONICS
C
O
.
I
NSTALLATION
A
ND
O
PERATIONS
M
ANUAL
2-7
S
ETUP
& I
NSTALLATION
Control To Indicate Delay (SW25-4,5,6)
If a Control To Indicate delay is desired, set SW25-4 through SW25-6 to the appropriate
position.
SW25-4
SW25-5
SW25-6
TIME
ON
ON
ON
No Delay
OFF
ON
ON
0.5mS
ON
OFF
ON
1.0mS
OFF
OFF
ON
2.0mS
ON
ON
OFF
4.0mS
OFF
ON
OFF
8.0mS
ON
OFF
OFF
16.0mS
OFF
OFF
OFF
32.0mS
Sub-Channel Interface Control Lead State (SW26-1,2,3,4,5,6)
The state of the control interface output lead for the Sub-Channel Port can be selected to
follow the Master Port or they can be forced to an active state. Set SW26-1 to
ON
ON
ON
ON
ON
if it is
desired that the C (DCE selected) / I (DTE selected) output lead for Sub-Channel 1, follow
the Master Port interface lead. Set SW26-1 to
OFF
OFF
OFF
OFF
OFF
if it is desired that the output interface
be forced Active.
Switch on Data / Control (SW27-1,2,3,4,5,6)
Each sub-channel is independently selectable for switch on data or switch on an active
interface control lead. Set SW27-1 to
OFF
OFF
OFF
OFF
OFF
if sub-channel 1 “Switch on Data” is required. Set
position 1 to
ON
ON
ON
ON
ON
if “Switch on Interface Control Lead” is desired. Position 2 through 6 are
associated with sub-channels 2 through 6.
Port DCE/DTE Selection (SW7 through SW20)
Slide switches SW7 through SW20 are used to configure DTE/DCE for each port. Slide
Both switches associated with a port to the same position. EXAMPLE: If connecting a
MODEM (DCE Device) to the PORT, then the port should be configured as a DTE
interface. Slide switches SW7 & SW8 to the DTE position (toward the DB-15 connectors).
Factory Test Jumpers (JP1,JP2)
The two test jumpers JP1 and JP2, must be installed for the unit to properly function.
These jumpers are used in the manufacture and test of the product prior to shipment.