NURO Conversion Instructions 

MACH C1500V-C2000V 

Runout Procedure 

1. 

Remove the factory jumpers / field wiring from enable/disable, start interlock 1, start 
interlock 2, damper end switch terminals.  

2. 

From the information screen on the NURO touch screen verify that the enable/disable 
circuit is open.  

3. 

Reinstall the factory jumper or the field wiring in the enable/disable terminals and give 
the boiler a call for heat.  Verify that the boiler is giving the error of start interlock 1 open.  

4. 

Turn the boiler off and reinstall the factory jumper or field wiring into the start interlock 1 
terminals. 

5. 

Turn the boiler back on, reset the error and verify the boiler is going into a start interlock 
2 open error. 

6. 

Turn the boiler off and reinstall the jumper or field wiring in the start interlock 2 terminals.  

7. 

Turn the boiler on, reset the error and allow the boiler to try and start.  Verify that the 
boiler locks out on damper end switch did not close in allotted time. 

8. 

Turn the boiler off and reinstall the factory jumper or damper end switch wires.  Turn the 
boiler back on and reset the control. 

9. 

In order to test the low water cut-

out, press and hold the red “Push to Test” button for at 

least 5 seconds.  A manual lockout reset error displaying 10010: “Low Water Limit” on 
the NURO touchscreen should occur.  The red LED indicator on the Low Water cut-off 
will no longer be illuminated. 

10. 

Optional Test Method: First turn the boiler off, and then turn off the boiler’s circulating 
pump.  Isolate the boiler from the system.  Drain the water level below the low water cut-
off probe.  Turn the boiler back on.  It should not operate, and a manual lockout reset 
error displaying 10010: “Low Water Limit” on the NURO touchscreen should occur.  The 
red LED indicator on the Low Water cut-off will no longer be illuminated. 

11.  Return the system to normal operation by re

filling with water, restarting the boiler’s 

circulating pump, and then turning the boiler back on. 

12. 

The boiler is furnished with a low gas pressure switch, installed near the boiler’s main 
gas shutoff/control valve.  The operation of this switch must be checked as follows:  

1. Close the main gas cock (external to the boiler).  
2. Cycle the boiler on by generating a heat request.  
3. Allow the boiler to proceed through prepurge and attempt ignition.  

 

When the main gas shutoff/control valve opens to attempt ignition, the low gas 
pressure switch will trip, causing the NURO touchscreen to display 10012: 

“Low 

Gas Limit”

.  Even after re-opening the main gas cock, 10012: 

“Low Gas Limit” 

will 

remain on the NU

RO display until the boiler is manually reset by pressing “Reset 

Control”. 

13. 

The boiler is furnished with a high gas pressure switch, installed near the boiler’s main 
gas shutoff/control valve.  The operation of this switch must be checked as follows:  

1. Before starting the boiler, close the downstream gas cock located inside the 

boiler’s enclosure.  

2. Cycle the boiler on by generating a heat request.  
3. Allow the boiler to proceed through prepurge and attempt ignition.  

 

Start Interlock 1, Start Interlock 2, and Air Damper terminals are 120 VAC.  Power must be off when removing, installing 
jumpers, or wires to these terminals.  

 

Summary of Contents for HARSCO MACH C1500V

Page 1: ...ch if not avoided could result in death or serious injury NOTICE Each safety device must be maintained and checked per the recommended schedule Refer to Section 6 in the O M Manual for more informatio...

Page 2: ...n be misused which could result in personal injury or death Lockout tagout procedure must be employed when servicing this unit Failure to do so could result in electrocution injury or death Label all...

Page 3: ...al block covers Identify and label all current field wiring on boiler when disconnecting 4 Remove 7 16 nuts as required that hold top panel on as shown in Figure 1 Top panel will need to be lifted at...

Page 4: ...evision A NURO Conversion Instructions MACH C1500V C2000V 5 Using a 1 8 drill bit drill out rivets that fasten high and low voltage terminal blocks 6 Remove 7 16 nuts from 4 inside corners of front fr...

Page 5: ...1005101718 ENVI MCBA to NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500V C2000V 7 Remove 3 T30 Torx screws from front frame as shown in Figure 3 Remove front frame Remove 7 16...

Page 6: ...12 19 2017 Revision A NURO Conversion Instructions MACH C1500V C2000V 8 With a T30 Torx bit loosen 3 screws that hold control panel in place shown in Figure 3 Figure 3 Loosen T30 Torx screws to contr...

Page 7: ...to wire colors for sensors as new panel will use same colors for sensor wires 9 Control panel can now be slid right lifted off screws and removed from boiler 10 Using a 1 2 wrench remove and replace...

Page 8: ...NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500V C2000V 11 Install heat exchanger sensor on front section of exchanger Sensor only needs to be finger tight DO NOT OVERTIGHTEN S...

Page 9: ...ront of boiler using supplied T20 self tapping Torx screws 14 Run all internal wires to appropriate safety devices and sensors Types of Wires Colors Identification Return Temperature Sensor Wires Blue...

Page 10: ...R TUBE 16 Install tubing for air switch and blocked flue switch Blocked flue tube will need to be cut to length to ensure that there is not tube slack Tube should be pitched down from switch to conden...

Page 11: ...frame assembly with 4 7 16 nuts in each corner from inside of cabinet 18 Install 3 T30 Torx screws along bottom of front frame assembly 19 Install front door on hinge pins 20 Install NURO touch screen...

Page 12: ...ions MACH C1500V C2000V 21 Insert green electric plug D1 and D2 into NURO control and attach all ground wires to front door ground lug 22 Install field wiring to new terminal boxes per wiring terminal...

Page 13: ...vision A NURO Conversion Instructions MACH C1500V C2000V 24 Flame Rectification Signal Lead wire shown in Figure 12 will not be used Use cap supplied in kit to cover end of wire connection Figure 13 G...

Page 14: ...Instructions 1005101718 ENVI MCBA to NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500V C2000V Figure 14 Figure 15 Heat Exchanger Sensor and Wires Blower Plugs...

Page 15: ...Instructions 1005101718 ENVI MCBA to NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500V C2000V Figure 16 High Limit Probe Low Water Cut Off Figure 17...

Page 16: ...rols to boiler 570 421 7500 and press 2 for technical support 26 After pairing is complete with technical support re energize gas supply to unit 27 Perform Runout Procedure 28 Perform factory start up...

Page 17: ...urn off the boiler s circulating pump Isolate the boiler from the system Drain the water level below the low water cut off probe Turn the boiler back on It should not operate and a manual lockout rese...

Page 18: ...ownstream manual isolation valve then turn the boiler back on and reset the control 15 Test the air switch for proper operation Allow the boiler to start Remove the tube from the air switch after 30 s...

Page 19: ...Instructions 1005101718 ENVI MCBA to NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500V C2000V...

Page 20: ...Instructions 1005101718 ENVI MCBA to NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500V C2000V...

Page 21: ...Instructions 1005101718 ENVI MCBA to NURO Date 12 19 2017 Revision A NURO Conversion Instructions MACH C1500V C2000V...

Reviews: