![Patriot Lighting 33573-MND Quick Start Manual Download Page 3](http://html1.mh-extra.com/html/patriot-lighting/33573-mnd/33573-mnd_quick-start-manual_4001167003.webp)
Wire Connector
2
Outlet Box Screw
Ground Screw
2
Mounting Screw
1
Universal Crossbar
3
1
DD
CC
AA
BB
3
AA
BB
CC
EE
DD
EE
Estimated Assembly Time: 45-60 minutes
PREPARATION
TOOLS REQUIRED
To avoid damaging the product, assemble it on a soft, non-abrasive surface, such as carpet or cardboard. Inspect each part for defects
such as the wire insulation for any cuts, abrasions, or exposed copper that may have occurred during shipping. If there is a defect in the
wire, do not continue the assembly process.
PRE-INSTALLATION
Flathead
screwdriver
Phillips
screwdriver
Pliers
Electrical tape
Wire cutters
Drill
HARDWRE INCLUDED
Hardware not shown to actual size