BEFORE STARTING ASSEMBLY
REQUIRED TOOLS
CAUTION
Some parts have steel edges. Please be careful when handling components.
Always wear work gloves, eye protection and long sleeves when assembling
or performing any maintenance on your shed. Do not attempt assembly on days
with strong winds or low temperatures.
Remove all of the pieces from the package and spread them out on the ground.
Before installation, please check the type and quantity of parts first.
It is recommended to use a clean work surface to spread the parts out and for
pre-assembly steps. Review all instructions before you begin, continue to refer to
instructions during assembly.
Be sure to follow all steps thoroughly.
Please prepare these components in advance at the beginning of each stage.
03
Requires two people and takes 2-3 hours for Installation.
Recommended to wear gloves to avoid scratches.
Please read the manual carefully before installation.
DO NOT RETURN YOUR UNIT
TO THE STORE
Contact us first
Summary of Contents for T-PS22-0110-BK
Page 5: ...05 P4R X1 P7 X2 P4L X1 PLATES P8 X1 STRIPS UR1 X1 20 X2 9L X1 DX1 X2 UL1 X1 8 X1 9R X1 10 X1...
Page 8: ...Bottom frame 09 page Wall 10 16 page Roof 17 18 page Door 18 20 page CONTENTS 08...
Page 10: ...STEP 3 STEP 4 10 V2 X3 F1 X3 V2 X3 F1 X3 1 4 2 3 P2 F1 V2 F1 V2 3 2 P2...
Page 11: ...STEP 5 STEP 6 11 V2 X6 F1 X6 V2 X4 F1 X4 F1 V2 F1 V2 10 1 3 P4AL F2 F2 X1...
Page 12: ...V2 X4 F1 X4 F2 X1 STEP 7 STEP 8 12 V2 X4 F1 X4 F2 X2 F1 F1 P4AR V2 V2 F2 F2 P4...
Page 13: ...V2 X4 F1 X4 F2 X1 STEP 9 STEP 10 13 V2 X4 F1 X4 F2 X1 F1 F1 V2 F2 P1AL V2 F2 P1AR...
Page 14: ...V2 X9 F1 X9 V2 X1 F1 X1 F2 X1 STEP 11 STEP 12 14 F2 P4L F1 V2 9L F1 V2...
Page 15: ...V2 X1 F1 X1 F2 X1 V2 X9 F1 X9 STEP 13 STEP 14 15 F1 F1 V2 9R P4R V2 F2...
Page 17: ...V2 X8 F1 X8 V2 X2 F1 X2 STEP 17 STEP 18 17 F1 V2 F1 V2 P7 P7 P8...
Page 19: ...STEP 21 STEP 22 19 F1 X20 F1 DX1 DX1 20 20 20 20 DH DH X2 F3 DH DG F3 X8...
Page 20: ...F1 X2 F3 X8 STEP 23 STEP 24 20 F3 F1 DF...