Pathfinder Series Installation Checklist

LED technology is significantly different to legacy MH, HID, and Sodium technologies and is 
easily damaged if incorrect installation techniques are applied. The following post Installation 
checklist must be completed and certified for by the installing technician or contractor. Execution 
of this form is mandatory in order to activate cover under the current product warranty statement. 

1

Item

Action

Instruction Manual Read and Understood

Technician Name

Initials

2

Grade 8.8 Main Pivot bolt and Lock bolt Installed.

 

CAUTION:

 In designated high wind areas at least one lock bolt must be installed

3

Driver/Luminaire interconnect cables, correctly graded, 

identified, and connected polarity Cross Checked.

CAUTION:

 LED Chip On Board is highly sensitive to reverse polarity. Even a few 

seconds of reverse polarity can irreparably damage the chip and severely shorten its 
life. All cables must be unambiguously identifiable and connected in accordance with 
the published wiring instructions. Any accidental reverse polarity exposure must be 
reported.

4

All Cable and conduit entries meet IP66 minimum and

correct installation verified

5

Driver and Luminaire interconnection box seals undamaged 

with lid screws torqued uniformly

6

Driver units correctly mounted in a suitable enclosure in 

accordance with installation instructions.

CAUTION:

 Drivers rely on convective air currents for cooling and must be mounted  

vertically with a minimum adjacent spacing of 50mm in a suitably ventilated enclosure

7

Driver enclosure temperature measurement:

 

Data to be collected after one hour continuous operation at Max Power Output. 
Record 1. Internal Air Temperature
             2. Ambient Temperature
             3. Number of driver modules per enclosure
             4. Total AC current draw for enclosure. 
NOTE: With multiple enclosure the test need only be conducted once if all 
installations are identical. If multiple tests are required use the back of the form to 
record the data

8

Pivot trunnion bolts torqued to a minimum of 107Nm.

The luminaire utilises multiple friction surface mounting. Correct torquing of the tie 
bolt, Post Aiming, is necessary to maintain installed sighting parameters and prevent 
damage to the luminaire in an extreme wind velocity event

X Check

I certify that the installation, Job Number Ref:

, has been carried out in accordance

with the appropriate Australian and Local Standards, where relevant, and that the above checklist has
been diligently executed with all due care.

Name

        Company & Title

   Signature

_______________

___________________ 

__________________ 

________________

Detach and Mail completed form to PLED Australia, 36, Harris Road, Malaga, Western Australia 6090
Within 90 days of project completion date

"

 

Total units & Geographical location of installation(Attach basic site plan if available)

2020 Pled Australia Pty Ltd. All rights reserved. For informational purposes only

PATHFINDER

LED

Lighting the way

Summary of Contents for PsT 900

Page 1: ...PsT 900 PsT 900XS Installation Instructions LED Floodlight PLED18 900 8 PATHFINDER LED Lighting the way 2020 Pled Australia Pty Ltd All rights reserved For informational purposes only...

Page 2: ...RIALAPPLICATIONS THE PRODUCT HAS BEEN DESIGNED FOR LOW MAINTENANCE AND IS SELF CLEANING IN REGIONS WHERE ADEQUATE NATURAL PRECIPITATION OCCURS IN EXTREME HOSTILE ENVIRONMENTS HOWEVER ESPECIALLY REGION...

Page 3: ...cipal Dimensions PS001_5Z_DR003B M6 x 16 ISO 7380 FL SS Screws x 4 PDM2I600 PS900 Driver Module PLED18 900 8 339 00 428 00 92 00 178 00 292 00 520 00 2020 Pled Australia Pty Ltd All rights reserved Fo...

Page 4: ...rade 8 8 GThe unit is cooled by convection DO NOT Install with Gravity vector perpendicular to Fin Plane PLED18 900 8 80 00 12 00 20 00 36 00 72 00 Azimuth Pivot R264 00 0 Tilt 0 0 1 2 5 0 0 8 6 0 0 2...

Page 5: ...ng 4 x M6 Flanged screws M6 x 16 ISO 7380 FL SS Screws PLED18 900 8 PDM2I60 PS900 Driver Module On Board Mounting 201 00 237 00 Choose pivot hole rotate driver module to desired position Torque retain...

Page 6: ...otherwise the useful life expectancy will be severely degraded and the warranty rendered void To ensure compliance with this limitation sample measurements of driver case Tc must be taken post install...

Page 7: ...polarity critical Continuous or momentary reverse polarity will irreparably damage the LED COB and void warranty PLED18 900 8 BROWN BLUE OUTPUT 1 BROWN BLUE OUTPUT 2 Control 1 Control 2 BROWN BLUE DR...

Page 8: ...gic Negative logic Casambi enabled modules are equipped with the CBU ASR twin channel Bluetooth dimming controller built into the driver assembly Once connected the luminaire assembly will be visible...

Page 9: ...external features on the heat sink body Luminaire orientation with 0 inclinometer set to 0 Elevation Adjustment Inclinometer Azimuth Reference Face PLED18 900 8 90 00 Torque trunnion Nuts to 107Nm Lu...

Page 10: ...lux meter In areas sensitive to light pollution it is highly recommended to obtain accurate aiming data and set the luminaire accordingly Loosen trunnion nuts and bracket mounting bolt Rotate luminai...

Page 11: ...cts of God such as lightning sandstorms or Solar Flare induced fluctuations in electrical power Products which have been modified or have had the identification label and or the tamper proof label alt...

Page 12: ...ons CAUTION Drivers rely on convective air currents for cooling and must be mounted vertically with a minimum adjacent spacing of 50mm in a suitably ventilated enclosure 7 Driver enclosure temperature...

Reviews: