Theory
22
START
What‟s Wrong?
Lever Lockout Activated
Go to Flow Chart 2
Broken Length Cable
Go to Flow Chart 3
No display
Go to Flow Chart 4
Anti-Two Block Problem
Go to Flow Chart 5
Length Reading Problem
Go to Flow Chart 6
Load Reading Problem
Go to Flow Chart 7
Bad Data Transfer Between
Console & Central Unit
Go to Flow Chart 8
Interference Problem
Go to Flow Chart 9
Angle Problem
Go to Flow Chart 10
7 TROUBLESHOOTING FLOW CHARTS
General Flowchart
This section explains how to handle a problem that may arise with the PAT Load Moment
Indicator System-PAT DS150. The procedures are easy to follow and are given in flowcharts on
the following pages. Start with the general flowchart below, which will guide you to one of the
detailed flowcharts shown in this section.
Summary of Contents for DS 150
Page 2: ......
Page 3: ......
Page 5: ...Service Manual DS150...
Page 7: ...Service Manual DS150...
Page 10: ...Mechanical Description Of The System 3 Basic System Component Layout...
Page 13: ...Drawings 6 4 DRAWINGS SYSTEM Electrical Diagram...
Page 14: ...Drawings 7 Central Unit 024 150 060 002 Spare Parts List...
Page 20: ...Drawings 13 4 5 Cable Reel 068 208 060 013 LWG208 Spare Parts List...
Page 24: ...Procedures 17 Length Angle Adjustments...
Page 26: ...Theory 19 6 THEORY Anti Two Block Shutoff Circuit Length Measuring Channel...
Page 27: ...Theory 20 Piston Side Pressure Measuring Channel Rod Side Pressure Measuring Channel...
Page 28: ...Theory 21 Main Boom Angle Measuring Channel Second Angle Measuring Channel...
Page 53: ...Error Codes 46 America Inc service department...