![background image](http://html1.mh-extra.com/html/paslode/t250a-f16/t250a-f16_operating-and-maintenance-manual_761554009.webp)
Coil Nailers
Step No. 1
– Grasp the nailer handle firmly with one
hand and with the other hand unlatch the magazine
cover clip. Swing the magazine door open.
Step No. 2
– Adjust the loading tray for nail length (if
required) by depressing the button on the post and
raising or lowering the tray to the desired position.
Step No. 3
– Remove the retainer from a nail coil and
place the nail coil in the magazine with the tips of the nails
against the loading tray and with about 4 inches of coil
unwound.
Step No. 4
- Slide the free strip of nails along the top of the
feeder body assembly and place the first nail between the
feed claw and the locator.
Step No. 5
- Carefully close and latch the magazine door.
Step No. 6
- Advance the first nail into driving position by
cycling the tool once against a work surface. The nailer is
now ready for use.
7
TOOL LOADING
Summary of Contents for T250A-F16
Page 1: ...P Operating and Maintenance Manual PNEUMATIC TOOLS 403606 18 08 07 ...
Page 18: ...P HERRAMIENTAS NEUMATICAS Manual de Operacion y Mantenimiento ...
Page 22: ...SISTEMAS NEUMATICOS 3 ...
Page 23: ...SISTEMAS NEUMATICOS continuación 4 403720 ...
Page 24: ...INSTALACION DE LA HERRAMIENTA 5 FUNCIONAMIENTO DE LA HERRAMIENTA ...
Page 29: ...MANTENIMIENTO 403720 ...
Page 30: ...11 403720 ...