![background image](http://html1.mh-extra.com/html/parus/sipb-series/sipb-series_user-manual_3842509050.webp)
50
Figure 21.
Communication Options and Control Terminals (1KVA Tower
model shown)
Installing Communication Options and
Control
Terminals
To install the communication options and control terminals:
1.
Install the appropriate connectivity card and/or necessary cable(s) and
connect the cables to the appropriate location.
2.
Route and tie the cable(s) out of the way.
3.
Continue to “Operation” on page 26/28 to start up the UPS.