![Parr Instrument Company 6300 Operating Instructions Manual Download Page 24](http://html1.mh-extra.com/html/parr-instrument-company/6300/6300_operating-instructions-manual_3774715024.webp)
4
P
ROGRAM
I
NSTALLATION
& C
ONTROL
P a r r I n s t r u m e n t C o m p a n y
24
Calorimeter Operations
Operating Mode
Determination
Bomb Installed/EE
1/940.0
Heater and Pump
OFF
Operating Controls
Method of Operation
Dynamic
Reporting Units
BTU/lb
Use Spiking Correction
OFF
“OTHER” Multiplier
4.1868
Calibrate Touchscreen
LCD Backlight Timeout(s)
1200 S
LCD Backlight Intensity
70%
Print Error Messages
ON
Language
English
Spike Controls
Use Spiking
OFF
Heat of Combustion of Spike
6318.4
Use Fixed Spike
OFF
Weight of Fixed Spike
0.0
Prompt for Spike before Weight
OFF
Bomb Rinse Tank Control
Report Rinse Tank Empty
ON
Rinse Tank Capacity
150
# Rinses Left
150
Reset Rinse Tank Counter
Rinse Time
25
Rinse Flush Time
20
Clear Time
100
# of Rinse Cycles
3
Program Information and Control
Date & Time Settings
Volume Level Adjust
85%
Software and Hardware Info
Settings Protect
OFF
User/Factory Settings
Feature Key
Bomb Type Select
User Function Setup
Cold Restart
User/Factory Settings
User Setup ID
63-1138
Reload Factory Default Settings
Reload User Default Settings
Save User Default Settings
Compare settings with Factory Defaults
Calibration Data & Controls
Calibration Run Limit
10
EE Max Std Deviation
0.0
Heat of Combustion of Standard
6318.4
Bomb Service Interval
500
Use Bomb
1
Control Chart Parameters
Charted Value
HOC Standard
Process Sigma
0.1
Temp Rise High Warning
8.5
Temp Rise Low Warning
5.1
Bomb 1 Through 4
EE Value
800.0
Protected EE Value
OFF
Thermochemical Corrections Standardization
Fixed Fuse
ON 50.0
Acid Correction
Fixed HNO
3
8.0
Fixed Sulfur
ON 0.0
Determination
Fixed Fuse
ON 50.0
Acid Correction
Fixed HNO
3
8.0
Fixed Sulfur
OFF 0.0
Net Heat/Dry Factors
Calculation Factors
Nitric Acid Factor
1.58
Figure 4-1
6300 Factory Default Settings
Summary of Contents for 6300
Page 2: ......
Page 10: ...PREFACE P a r r I n s t r u m e n t C o m p a n y 10 This page left blank intentionally...
Page 20: ...2 INSTALLATION P a r r I n s t r u m e n t C o m p a n y 20 This page intentionally left blank...
Page 76: ...B CALCULATIONS P a r r I n s t r u m e n t C o m p a n y 76 This page intentionally left blank...
Page 123: ...PARTS LISTS DRAWINGS 6300 F w w w p a r r i n s t c o m 123 Figure F 20 6300 Air Can Assembly...
Page 129: ......