6)  Direction  rule

 

The  right

-

side  fixed  barrier  gate  installation  rule

:

 

 

The  bar  inside  the  gate

 

7)  Installation

debugging  and  usage

 

 

Installation  of  mechanism  part

 

7

.

1

.

1

Please  select  the  right  type  of  the  barrier  gates  according

 

to  the  specifications  of  the  place

Fix  the  barrier  gate  case

 

board  with  expansion  bolts

(

refer  to  the  fig

.

3

)

 

 
 

Reference  size

 

Expansion  bolts

 

 
 

 

Outside  the  gate

 

 

 
 

Barriers  fix  at  right  side  of  the  gate

 

Fig

.

1

 

 

Fixation  of  R

-

type  case

 

 

Reference  size

 

 

The  barrier  gate  fix  at  the  right  hand  side  of  the  access

 

 

The  left

-

side  fixed  barrier  gate  installation  rule

:

 

 

The  bar  inside  the  gate 

Bar  is  inside  the  gate

 

L

 

 

 

H

 

Barriers  case  board

 

Fig

.

3

 

 

Fix  the  boom  to  the  boom  tray  with  the  boom  press  board

then  cover  the  boom  capuche  with  the  screws

After  that

fix 

the  cover  of  the  boom  to  the  splint  and  fasten  them  with

 

four  screws  of  4×16

and  slip  the  cover  tap  to  the

 

correspondent  hole  in  the  boom  cover

Finally

fasten  the

 

cover  tap  with  the  cover  by  two  3×10  screws

.

 

Unlock  the  clutch  device  with  the  clutch  key  clockwise

Move

 

the  boom  to  the  horizontal  and  vertical  position  manually  to 
make  sure  there  is  no  obstruction

Then  turn  on  the  power 

(

refer  to  the  Fig

.

4

)

 

 

 
 

 
 
 

Barrier  fix  at  left  side  of  the  gate

 

Fig

.

2

 

 

The  barrier  gate  fix  at  the  left  hand  side  of  the  access

 

 
 
 
 
 

Fig

.

4

 

Lock 

Unlock

 

Summary of Contents for AGT 210

Page 1: ...AGT 210 Automatic Gate User s Manual Issue Date 2015 06 Parktron Technology Co Ltd 2014 2024 Parktron Technology Ltd ...

Page 2: ...luding assembly and testing are all locally conducted by Parktron team in our Taiwan factory to ensure a premium quality level that can line up with our parking system products 5 M achine Core Design 3 6 Di rection Rules 4 7 Installation A djustment and Use 5 Installation for Mechanism Part 5 Adjustment and Use of the Mechanism Part 6 Springs Selection Installation and Adjustment 10 7 4 Installati...

Page 3: ... 2014 2024 Parktron Technology Ltd 2014 2024 Parktron Technology Ltd 2 Notice The Boom Height means height from the boom holding point to the ground ...

Page 4: ...the crash when the boom falling so as to prevent the vehicles from being pressed Both external and internal loop detectors are supported 3 7 Open Close and Stop controlling interfaces RS 485 communication serial interface optional Traffic light signal connection device red light for stop green light for pass Remote control and wire control for selection 4 Working environment Balance crank Link hol...

Page 5: ...ide of the access The left side fixed barrier gate installation rule The bar inside the gate Bar is inside the gate L H Barriers case board Fig 3 Fix the boom to the boom tray with the boom press board then cover the boom capuche with the screws After that fix the cover of the boom to the splint and fasten them with four screws of 4 16 and slip the cover tap to the correspondent hole in the boom c...

Page 6: ...ress is just right a 2 Adjust locknuts in both sides of link pole until the boom is vertical Then tighten up the locknuts again b If the boom is unsteady in the horizontal position refer to fig 7 screw the adjusting screw of the balance spring clockwise to enhance the spring tension Attention the spring tension could not be too hard Fig 6 Fig 7 D The best methods to adjust the boom Attention the c...

Page 7: ...uts on both sides of the link pole rotate the link pole right or left to adjust the arm then screw down the locknuts again when the boom is in the horizontal position F b If the boom is vibrant as it falls down to the horizontal position F b 1 Refer to Fig 9 1 adjust the shock absorption screw B to diminish the press to the shock absorption rubber B shock absorption cushion if the adjusting is not...

Page 8: ... spring so that it can balance the weight of the arm C Spring replacement C a Rise up the boom to the vertical position If the power is off unlock the clutch device put the boom to the vertical position manually and make sure the boom would not fall down C b Spin the bottom adjusting nut anticlockwise to disassemble it and the baffle ring C c Fall down the boom to the horizontal position manually ...

Page 9: ...ference this diagram RS 485 Communication Exterior Vehicles Detector Signal Interface Special for Motorcade Down Limit Signal Output Photocell Power Output C e Insert the screw mandrel again and fix it to the selected link hole C f Rise up the boom to the vertical position again and make sure the boom will not fall down C g Install the adjusting nuts and the baffle ring in the lower part of the sc...

Page 10: ...oard supports the Rs485 serial communication to control the boom UP and DOWN Please link the computer with Rs485 interface by the communication module The software please refer to the instruction in the disk Optional device H Terminal special for motorcade If the users have installed the loop detector and do not want the barrier boom fall down automatically when there are still some cars in line b...

Page 11: ...ck whether the clutch device is locked or not 2 There is too much vibrant when the boom is rising or falling a Please check whether the shock absorption rubber is broken or not if yes change a new one b Please check whether the balance spring is overused and distorted If yes change a new one or spin bottom adjust nut 3 The boom could not rise up or fall down to the end a When change a long boom to...

Page 12: ...e remote control code does not match the one on the remote controller and the infrared photo cell please adjust it as below There is a control code table pasted on the back of the remote controller and the transformer of the radio controller for coding Open the controller cover take out the battery There is a code pad on the PCB the direction is from right to left and the first code is on the righ...

Page 13: ... adjust this laser obstacle to make it point upwards and form an angle 90 with the arm When the laser obstacle moves into the slot and the red light is on the falling limit will work and the boom will lie horizontally Check the horizontal angle between the boom and the horizontal position and adjust the laser obstacle to make the boom be perfectly horizontal 20 2014 2024 Parktron Technology Ltd 20...

Reviews:

Related manuals for AGT 210