27
GB
IE
Observe the safety in-
formation and notes on
charging and proper
use as shown in the
instruction manual for
your battery and char-
ger from the Parkside
X 12 V Team series. A
detailed description of
the charging process
and further information
can be found in the se-
parate operating inst-
ructions.
Operation
Remove the rechargeable
battery from the device to
prevent accidental operation.
Risk of injury!
Ensure that the ambient tem-
perature does not exceed
50°C or fall below -20°C du
-
ring work.
Removing/inserting the
Battery
1. To remove the battery (10) from the ap
-
pliance, press the release button (11)
on the battery and pull out the battery.
2. To insert the battery (10), place it on
the guide track and push it into the ap
-
pliance. It will audibly snap in.
Checking the battery charge
level
The battery’s (
10) charge level is indi
-
cated by the charge state indicator (
4).
The LEDs indicate the battery’s charge
level, when the device is in operation.
Press and hold the power button (
7).
red-yellow-green
=> Battery fully charged
red and yellow
=> Battery half charged
red
=> Battery needs
to be charged
Recharging the battery
Allow a hot battery to cool before
charging.
Charge the battery (
10) when
only the red LED on the level indica-
tor is illuminated.
The charging time is around 1 hour.
1. Remove the battery (
10) from the
appliance if necessary.
2. Plug the battery charger (
13) into a
mains outlet.
3. Insert the battery (
10) in the charg
-
ing compartment of the battery charger
(
13).
4. Pull the battery (
10) out of the bat
-
tery charger (
13).
5. Unplug the battery charger (
13)
from the mains.
Overview of the LED indicators on
the charger (13):
Green LED illuminated while the
rechargeable battery is not inserted
:
Charger is ready
Green LED lights up:
Battery is charged
Red LED lights up:
Battery charging
Red LED flashes:
Error
Summary of Contents for 338167 2001
Page 3: ...1 2 3 4 12 5 6 10 13 11 7 8 9 6 9 1 14 15 1 2 14 D...
Page 107: ...107...
Page 115: ...115...
Page 117: ...117 2020 07 01_rev02_ts...