background image

This equipment is part of a large range of traffic flow products. Any of the instructions in this manual should only be carried out 
by a qualified service engineer or a competent person.

The following information is a guide only, and whilst we have made every effort to be accurate and correct there may be printing 
errors which we cannot be held responsible for.

With a correct installation you can expect to enjoy many years of reliable service from this product, we do however recommend 
that the product has a bi-annual service carried out by a qualified engineer. 

Thank you for your custom and welcome to the exciting world of Total Traffic Flow Solutions.

/

    

/

20

!

Important Safety Notice

Manual Swing Gates are designed to Control the flow of 
vehicular traffic only. It can be dangerous to allow the passage of 
pedestrians and any other self-powered animal or device to 
utilise this method of access.

It may be necessary for the end user of this product to provide 
an alternative, safe method of access to cater for the previously 
mentioned categories.
The end user should fit all necessary signage and warning 
notices to either side of the gate, which should be visible and 
clear from all directions of approach.

Please sign and date below to say that you have read and 
understood this notice before ANY installation work:

 The “Warnings” leaflet and “Instruction booklet” supplied with this

product should be read carefully as they provide important information

about safety, installation, use and maintenance.

Scrap packing materials (plastic, cardboard, polystyrene etc) according

to the provisions set out by current standards. Keep nylon or polystyrene

bags out of children's reach.

Keep the instructions together with the technical brochure for future

reference.

This product was exclusively designed and manufactured for the use

specified in the present documentation. Any other use not specified in

this documentation could damage the product and be dangerous.

The Company declines all responsibility for any consequences resulting

from improper use of the product, or use which is different from that

expected and specified in the present documentation.

 Do not install the product in explosive atmosphere.

The construction components of this product must comply with the

following European Directives: 89/336/CEE, 73/23/EEC, 98/37/EEC

and subsequent amendments. As for all non-EEC countries, the abovementioned

standards as well as the current national standards should

be respected in order to achieve a good safety level.

Information on using
this manual

Ÿ

Read all information thoroughly

Ÿ

Pay attention to all safety advice

Ÿ

Be  aware  of  the  symbols  (shown  above  right  and 
above left) as they have different meanings. One is an 
information symbol, the other a warning.

Ÿ

There are many artists impressions of the product in 
this manual you should refer to the images as a guide 
only. 

Professional CAD

 drawings should be used as 

a reference drawing and nothing else. As before every 
effort  has  been  made  to  be  100%  accurate  in  this 
manual but we cannot make any guarantees.

Ÿ

As  we  constantly  innovate  our  products  we  may 
change  the  quoted  spec  and  any  other  details  that 
have been documented in this manual so you should 
always refer to the supplier to see if the manual that 
was shipped with your product is the latest edition.

Ÿ

As  with  all  installations,  only  competent  and  skilled 
personnel should carry out the procedures detailed in 
this manual.

Ÿ

Be sure to fill out and complete 

ALL

 paperwork where 

instructed as this manual is the equipments log book 
and maintenance manual.

in

Parking and access control equipment manufactured in the UK

Manual Swing Gate

Summary of Contents for PF5700

Page 1: ...ntrol equipment manufactured in the UK PF5700 Swing Gate Manual Rev 1 0 Installation Operation Maintenance Manual Manual Barriers Auto Sliding barriers Auto Bi Fold barriers Auto Rising Kerbs Turnstiles Auto Rising Bollards ...

Page 2: ...rochure for future reference This product was exclusively designed and manufactured for the use specified in the present documentation Any other use not specified in this documentation could damage the product and be dangerous The Company declines all responsibility for any consequences resulting from improper use of the product or use which is different from that expected and specified in the pre...

Page 3: ...eight 1000mm Finish Yellow RAL 1021 As Standard Galvanised Optional Extra Fixing Options Cast In As Standard Bolt Down Wall Mounted Accessories Latch Back Posts Optional Extra Padlock Keys Padlock Shroud Optional Extra in Parking and access control equipment manufactured in the UK Manual Swing Gate ...

Page 4: ...ds IMPORTANT INFORMATION The PF5700 Manual Swing Gate is designed for the control of motorised vehicles It is NOT DESIGNED for pedestrian use or any other use It is important to ensure an alternative access route is available for pedestrians and other site users who are not in a motorised vehicle Signage is recommended to try and prevent misuse Weather conditions may cause the Manual Swing Gate to...

Page 5: ...6 in Parking and access control equipment manufactured in the UK Swinging Access Gate Figure 9A Standard Swing Arm Barrier Exploded ...

Page 6: ...ate 7 Item Item Item Item Description Description Description Description 01 Barrier Hinge Post 02 Barrier Leaf 03 Closing Post 04 M20 x 120 Hex Hd Bolt 05 Washer 06 Hex Nut 07 Eye Bolt Hinge 08 M8 x 40 Hex Hd Screw 09 M8 Washer 10 M8 Nyloc Nut 11 Neoprene 12 Latch 13 Padlock Keys ...

Page 7: ...y Glasses High Vis Jackets Gloves Safety Boots 4 Inspect barrier for damage 5 Ensure hinge mechanism is free from contaminants 6 Check the locking mechanism for serviceability 7 Check the Hand wind handle for ease of operation 8 Ensure all post holding down bolts are secure andare tight 9 Check operation of the barrier and ensure barrier locks in open and closed positions 10 Wipe down and clean ba...

Page 8: ... be adhered to at all times 3 Care is to be exercised to reduce tripping hazards eg Removing such hazards away from the working area 4 Working area to be cordoned off prior to commencingwork 5 Operators to wear Hi Vis Coats Waistcoats Waterproofs 6 PPE to be worn as and when required and in line with our policy Hard Hat Safety Glasses High Vis Jackets Gloves Safety Boots 7 COSHH Regulations to be o...

Page 9: ...red of all possible obstacles or hazards ii Site should be checked to ensure no vehicles pedestrians are within vicinity of barrier and any present are made aware the barrier will be operating 9 1 2 9 1 2 9 1 2 9 1 2 OPERATION OPERATION OPERATION OPERATION i Whilst holding the barrier leaf to retain control of the barrier unlock and release the barrier leaf from the close post ii Steadily open the...

Page 10: ...n On the heavy duty barriers these nuts are located on the hinge post with one mounted externally and the other internally to access the internal nut you must first remove the cover plate on the side of the barrier hinge post once inside the hinge may be adjusted in exactly the same fashion as the standard barriers COMMISSIONING It is preferable that both the installation and com missioning take pl...

Page 11: ...suitable percussion drill drill through the four base plate holes to a depth of 170mm taking care to keep the hole free from excessive dust The M12 mm x 150 long expansion bolts can now be hammered into the prepared holes keeping the nuts in the extreme upper position Tighten down all foundation bolts Barrier Leaf Suspend the barrier in a vertical attitude from the crane or forklift truck and lowe...

Page 12: ...ied out when the equipment is erected We recommend a minimum of 7 to 10 days for the concrete to cure depending on climate This time can be reduced if additive agents are used IMPORTANT NOTE IMPORTANT NOTE IMPORTANT NOTE IMPORTANT NOTE All bases must be at the same level Careful consideration should be made when deciding the location of the barrier to avoid obstructions such as power cables teleph...

Page 13: ...hat has been installed on your your customers site This is in no way a health and safety guide just a few key areas for you to be aware of and possibly make future changes to Plan view from above Sketch system layout detailing and numbering potential hazard areas for the client Potential Hazard Areas see diagram 1 2 3 4 5 Additional Comments Descriptions concerning safety on this site Signed 18 ...

Page 14: ...e time out etc System has had the completed conformity certificate All items on the delivery note have been handed over to client site this should be signed for on the separate sheet which is titled Delivery Note green or yellow paper if parts missing call supplier The engineer has expressed the importance of regularly maintaining the equipment POWER ISOLATION The power isolator for your automatio...

Page 15: ...e repair work is carried out on the product This is to achieve two things 1 To keep a history of the product for yourself and your supplier manufacturer 2 To keep an accurate log of any historical or recent modifications and or problems to help an engineer in the event of any future work required on the product in Parking and access control equipment manufactured in the UK Swinging Access Gate Ser...

Page 16: ...F9500A O M 5 0 System guides and drawings as defined within O M Manuals Part 4 The following test procedures refer Check Lists pages 15 16 Commissioning Certificate Part 5 Existing Installation Items not covered under warranty This certificate Installers Name On Behalf of Address Signature Date of Signing Position Parts Handed Over Qty Part 6 Certificate Signing off Section Client Name On Behalf o...

Page 17: ...munity generic standard residential commercial and Heavy Industry Made in the UK Company Representative from manufacturer Name Anthony Green Position Managing Director PF Ltd Unit One Kingsbury Link Trinity Road Tamworth Staffs B78 2EX Date of Declaration 01 04 2010 Person Authorised to compile file Name Damian Speer PF Ltd Position Service Technical Team Company Installing who is established in t...

Page 18: ...Y ENVIRONMENT NOXIOUS MATERIALS EUROPEAN MARK CERTIFYING CONFORMITY TOTHE ESSENTIALREQUIREMENTS OFTHE STANDARDS 2006 42 EC Proudly Proudly Made Made in the UK in the UK Proudly Made Made using recycled paper in Parking and access control equipment manufactured in the UK Swinging Access Gate ...

Reviews: