Swinging Access Gate
13
INSTALLATION
INSTALLATION
FOUNDATION
If details of the base have not
been specified, we recommend
a concrete mix to BS EN 206-
1:2000 “Concrete specification,
Performance, Production and
Conformity” to type C32/40,
which is equally suitable for
external
and
internal
environments. Alternative types
of base construction may be
acceptable,
subject
to
discussions with our Contract
Engineering Department. It is
not
not
not
not necessary to pre-drill the
base to receive the equipment;
the drilling is carried out when
the equipment is erected. We
recommend a minimum of 7 to
10 days for the concrete to cure,
depending on climate. This time
can be reduced if additive
agents are used.
IMPORTANT NOTE:
IMPORTANT NOTE:
IMPORTANT NOTE:
IMPORTANT NOTE:
All bases must be at the same level.
Careful consideration should be made when deciding
the location of the barrier to
avoid obstructions such as power cables, telephone cables, trees and similar likely
constructions.
Accessibility around the whole of the barrier shoul
d be maintained to a minimum of
1000mm to allow sufficient room for installation, s
ubsequent maintenance and
operation.
IMPORTANT NOTE:
IMPORTANT NOTE:
IMPORTANT NOTE:
IMPORTANT NOTE:
PFL should be consulted immediately should any
possible restrictions occur
Figure 3 - Foundation Detail