MAINTENANCE
Step 6:
Start the High Pressure Pump by pressing the
H PMP
button located on the Master Control Center (or
on the Remote Control Center).
Step 7:
Upon start-up inspect all plumbing connections in the unit for leakage. Varying temperatures during
shipment may cause plumbing connections to seep when starting the RO unit for the first time. Secure
the unit and repair any leaks before proceeding. Once leaks are repaired, open the seawater source
and restart the unit.
Step 8:
Observe the Brine Flowmeter, to ensuring all air and bubbles exited the RO system prior to proceeding
to next step.
Step 9:
Gradually turn the High Pressure Bypass Valve (Black Valve) to
NORMAL/RO
position. The pressure
gauge should rise steadily to a reading of 800 psi.
NOTE:
When the High Pressure Bypass valve is closed, the salinity of the initial permeate produced will
be relatively high and will probably activate the salinity alarm, do not be worried. Salinity should
reduce in 3 to 5 minutes.
Step 10:
Observe the system pressure on the High Pressure Gauge. During RO production, the indicated pressure
should be at 800 psi. If the pressure reading is not at 800 psi, adjust the pressure regulator valve (Refer to
Figure 4.1) using a screwdriver, until the reading reaches 800 psi.
NOTE:
If the RO unit is used for other than seawater purification (in freshwater or brackish water
applications), reduce pressure as necessary to achieve product flow no greater than 120% of
design flow to avoid membrane damage.
RO high pressure production should NEVER EXCEED 950 psi, doing so risks damage to RO
unit, VOIDING factory warranty and may also risk personal injury.
NOTE:
At initial start-up of RO unit, PRESS
DUMP
on the Master Control to keep the product water
diverted from the water storage tank. IF the unit is filled with preservative storage solution, water
must be kept running AT LEAST 30 MINUTES to clear preservative solution from system
.
Step 11:
Check the RO unit for water leakage periodically at the initial start-up. Observe Product Flow meter.
Record the product flow after 48 hours of operation (use the sample log sheet provided in Table 5.3).
NOTE:
For Remote Control Operation:
The initial start-up of the RO unit must be followed FIRST prior to use of remote. Once initial
start-up steps are performed, the necessary valve (HP Bypass and Freshwater Flush) positions
would be set. Therefore the RO unit may now be started (or stopped) via the remote control
panel for steps 5-6.
4.2
TO SHUT DOWN UNIT
Step 1:
As the RO unit operates, turn the High Pressure Bypass Valve (Black Valve) to
CLEANING POSITION
.
This will release the high pressure and air trapped within the RO system.
NOTE:
For the Remote Control Operation: The HP Bypass Valve may be left in the RO position (FULL
CLOCKWISE) during shutdown. STEP #1 would be OMITTED.
Master Control Center (or via Remote Control Center)
Step 2:
Press the
H PMP
button to stop the High Pressure Pump.
Master Control Center (or via Remote Control Center)
Step 3:
Press the
L PMP
button to stop the Low Pressure Pump.
Step 4:
Then turn switch
OFF
on your breaker at the main breaker panel.
The RO unit may be left in this “stand by” condition with the seawater for up to seven days or three days
in hot, tropical climates. If the RO unit will be out of service for extended time periods, please refer to
the Maintenance section of this manual.
Summary of Contents for Pure Water Series
Page 2: ......
Page 3: ...THE PURE WATER SERIES 400 2000 GPD USER GUIDE REFERENCE MANUAL ...
Page 4: ......
Page 7: ......
Page 9: ......
Page 62: ...TROUBLESHOOTING Figure 8 0 Troubleshooting Flow Diagram T ...
Page 63: ...TROUBLESHOOTING Figure 8 0 Troubleshooting Flow Diagram CONTINUED T ...
Page 64: ...DRAWINGS AND DIAGRAMS 38 VMT v JUNE 2008 9 0 DRAWINGS AND DIAGRAMS ...
Page 65: ......
Page 66: ......
Page 67: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ...PARTS REFERENCE 62 VMT v JUNE 2008 Drawing upgrade as of 4 1 2015 ...
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ...PARTS REFERENCE 39 VMT v JUNE 2008 10 0 PARTS REFERENCE ...
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ...MANUFACTURER S LITERATURE 92 VMT v JUNE 2008 Drawing upgrade as of 4 1 2015 ...
Page 135: ...MANUFACTURER S LITERATURE 40 VMT v JUNE 2008 11 0 MANUFACTURER S LITERATURE ...
Page 136: ......
Page 165: ...708 Series High Pressure Titanium Positive Displacement Pump 26 ...
Page 166: ...708 5 DRAWINGS ...